Storage (Duration 2h)

7 unique locations (11 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Land to the west of Pound Road, Axminster EX13 5UP (2 components)
β€’ A 120.000 MW / 180.000 MWh battery energy storage system
β€’ A 120.000 MW / 240.000 MWh battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED AXMINSTER Axminster - Pound Rd Not Prequalified EX13
Active β€’ 2027-28 (T-4), 2026-27 (T-4)
42.18 MW
Land South Of Marsh Farm Marsh Lane Fobbing Essex SS17 9JW (2 components)
β€’ A 49.400 MW / 98.800 MWh battery energy storage system
β€’ A 57.000 MW / 85.500 MWh battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU RAYLEIGH 1 Not Prequalified SS17
Active β€’ 2029-30 (T-4), 2026-27 (T-4)
21.03 MW
Land South of Church Farm, Somersham, IP8 4PN and Land East of The Channel, Burstalhill, IP8 4JL (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU BRAMFORD 1 Not Prequalified IP8
Active β€’ 2026-27 (T-4)
11.67 MW
LAND EAST AND WEST OF HONILEY ROAD (A4177), HONILEY, KENILWORTH, WARWICKSHIRE (1 component) Geocoding Needed

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU BERKSWELL Rejected
Active β€’ 2026-27 (T-4)
11.67 MW
Land at Impens Farm, Petherton Road, North Newton, Bridgwater, Somerset, TA7 0BB (3 components)
β€’ A 49.400 MW / 98.800 MWh battery energy storage system
β€’ A 57.000 MW / 85.500 MWh battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU BRIDGWATER 2 WEST BURTON TA7
Active β€’ 2029-30 (T-4), 2026-27 (T-4)
32.70 MW
Denmead Farm Edneys Lane Denmead Waterlooville Hampshire PO7 6JN (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU LOVEDEAN Not Prequalified PO7
Active β€’ 2026-27 (T-4)
11.67 MW
Barleylands Barleylands Road Billericay Essex CM11 2UD (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU RAYLEIGH 2 Not Prequalified CM11
Active β€’ 2026-27 (T-4)
11.67 MW
Loading map...
Showing 7 locations