Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

4 unique locations (77 components)

Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)
• 12-turbine wind farm located in Scotland with the installed capacity of 43.200MW
• Energy facility comprising of reciprocating engine sets.
• The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.85 MW
Land Adjacent to Belfield Substation, Belfield Road, Rochdale, Manchester, Greater Manchester, OL16 2XX (4 components)
• Battery energy storage system, together with associated equipment, infrastructure and ancillary works.
• New Build CMU comprising of battery storage and associated plant
Active • 2028-29 (T-4), 2026-27 (T-4)
16.68 MW
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW
South West side of the A444, Castle Gresley, DE11 9ES (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2026-27 (T-4)
3.13 MW
Loading map...
Showing 4 locations