Storage (Duration 2h)

7 unique locations (209 components)

135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (7 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.68 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (16 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
91.05 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (113 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5209.30 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (46 components)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 6)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4371.10 MW
Land at STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.

Active • 2025-26 (T-1)
19.73 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (10 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2024-25 (T-1) ...
1165.32 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (15 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
259.70 MW
Loading map...
Showing 7 locations