Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

7 unique locations (23 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Land Off Severn Road Hallen Bristol South Gloucestershire BS10 7SE (2 components)
β€’ Grid scale energy storage system based on Lithium Ion tech, capable of exporting the declared capacity for the stated duration
β€’ Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU AVONMOUTH094 Rejected BS10
Active β€’ 2029-30 (T-4), 2028-29 (T-4)
25.43 MW
Land off Fordhouse Lane, Stirchley, Birmingham B30 3AG (4 components)
β€’ Grid scale energy storage system based on Lithium Ion tech, capable of exporting the declared capacity for the stated duration
β€’ Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Stirchley B1 Stirchley B2 +1 more B30
Active β€’ 2029-30 (T-4), 2027-28 (T-4) ...
11.10 MW
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (5 components)
β€’ Grid scale energy storage system based on Lithium Ion tech, capable of exporting the declared capacity for the stated duration
β€’ Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
β€’ Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU KEMSLEY089 Kemsley B1 +2 more Rejected ME10
Active β€’ 2029-30 (T-4), 2028-29 (T-4) ...
83.13 MW
Land North Of Stoke Lane Dunston Norfolk, NR14 8QD (2 components)
β€’ " Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration"
β€’ Grid scale energy storage system based on Lithium Ion tech, capable of exporting the declared capacity for the stated duration
Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Norwich2 Rejected NR14
Active β€’ 2029-30 (T-4), 2028-29 (T-4)
25.43 MW
Land Lying To The South Of Manor Farm, Ratcliffe On Soar, Nottingham NG11 0EA (2 components)
β€’ Grid scale energy storage system based on Lithium Ion tech, capable of exporting the declared capacity for the stated duration
β€’ Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Ratcliffe0082 Not Prequalified NG11
Active β€’ 2029-30 (T-4), 2027-28 (T-4)
37.15 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (6 components)
β€’ Grid scale energy storage system based on Lithium Ion tech, capable of exporting the declared capacity for the stated duration
β€’ Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Westhoughton
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton0077 Bolton0078 +3 more Not Prequalified BL5
Active β€’ 2029-30 (T-4), 2027-28 (T-4) ...
18.41 MW
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (2 components)
β€’ Grid scale energy storage system based on Lithium Ion tech, capable of exporting the declared capacity for the stated duration
β€’ Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU BURTON086 DE14
Active β€’ 2029-30 (T-4), 2028-29 (T-4)
9.19 MW
Loading map...
Showing 7 locations