Storage (Duration 2h)

220 unique locations (806 components) - Page 1 of 9

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Yeowood Farm, Iwood Lane, North Somerset, BS40 5NU (1 component)

A 2-hour duration containerised battery

Active • 2029-30
9.87 MW
Withy Place, Bramley Road, Silchester, Reading, RG7 2LN (2 components)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Withy Place Not Prequalified RG7
Active • 2029-30 (T-4), 2028-29 (T-4)
21.46 MW
15.63 MW
Whitehill BESS, Land at Whitehill Estate and Edinbarnet Estate, Cochno Road, Clydebank, G81 5QS (4 components)

Front of meter BESS plant. The Connection Capacity stated is lower than the BESS capacity and the connection agreement - this is to allow for degradation of the battery over …

Active • 2029-30
73.63 MW
Whitburn Road, East Whitburn, West Lothian, Scotland, EH48 2XJ, United Kingdom (2 components)

Battery energy storage system 2hr duration with the associated infrastructure to allow for export to the grid network. The MEC/TEC under the connection agreement is stated as 200MW, this CMU …

Active • 2029-30
30.33 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (6 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Whaddon Farm BESS Whaddon Farm Solar Park BA14
Active • 2029-30 (T-4), 2027-28 (T-4) ...
7.89 MW
West Nash Road, Nash, Newport, NP18 2BZ (3 components)
• A new build 115MW/230MWh 2 hour Battery Energy Storage System to be connected to the National Grid Transmission Network at 132kV located at the Uskmouth substation
• A new build 115MW/230MWh battery energy storage system connected to the National Grid Transmission network at 132kV, located at Uskmouth
• A new build 119.9MW/239.8MWh 2 hour Battery Energy Storage System to be connected to the National Grid Trasnmission Network at 132kV located at the Uskmouth substation.
Active • 2029-30, 2026-27
66.29 MW
18.68 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (5 components)
• New build 49.995MW / 99.990 MWh battery energy storage system. (2)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
Active • 2029-30 (T-4), 2027-28 (T-4) ...
34.27 MW
3.91 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (6 components)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. (2)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is currently in construction and due to be operational in Q4 ?23.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
30.29 MW
The fields close to the Land at Little Hale Drove, Sleaford, NG34 9BG, United Kingdom (2 components)

LHBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Storage (Duration 2h) AGR SOLAR 3 LIMITED New Build Generating CMU Not Prequalified NG34
Active • 2029-30 (T-4), 2028-29 (T-4)
17.22 MW
The fields close to The Cottage, The Priory, Priory Lane, Little Wymondley, Hitchin, SG4 7HD (2 components)

WYBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Storage (Duration 2h) AGR SOLAR 4 LIMITED New Build Generating CMU SG4
Active • 2029-30 (T-4), 2028-29 (T-4)
9.36 MW
St Philips Energy Storage Facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (4 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (ST PHILIPS) LIMITED New Build Generating CMU St Philips BS2
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4.29 MW
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (2 components)

The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.

Storage (Duration 2h) SSE UTILITY SOLUTIONS LIMITED New Build Generating CMU Staythorpe BESS Not Prequalified NG23
Active • 2029-30 (T-4), 2027-28 (T-4)
132.07 MW
Speke Hall Avenue, Speke, Liverpool, L24 8DA (4 components)
• A new build, battery energy storage system (2)
• A new build, gas fueled generation station.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
8.81 MW
South West side of the A444, Castle Gresley, DE11 9ES (2 components)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2029-30 (T-4), 2026-27 (T-4)
5.91 MW
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (3 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bolton A Bolton A Not Prequalified BL5
Active • 2029-30 (T-4), 2028-29 (T-4) ...
6.33 MW
Site at Whitehill Farm, Coatbridge Road, Gartcosh, G69 8DT, United Kingdom (2 components)
• New build battery energy storage system
• New build battery energy storage system.
Active • 2029-30
43.96 MW
Site at Raiths Industrial Estate, Kirkton Drive, Dice, Aberdeen, AB21 0BG (2 components)

New build battery storage

Storage (Duration 2h) DYCE BATTERY STORAGE LIMITED New Build Generating CMU Not Prequalified AB21
Active • 2029-30 (T-4), 2028-29 (T-4)
21.42 MW
"Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS, United Kingdom" (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• ... and 7 more unique descriptions
Active • 2029-30 (T-4), 2028-29 (T-4) ...
153.09 MW
Scouse Farm, Hawkchurch, Axminster, EX13 5UE. (1 component)

A 50MW Battery Energy Storage system.

Active • 2029-30
10.99 MW
Scawby Brook, Brigg, Lincolnshire DN20 9LT (9 components)
• A Prospective New Build Gas reciprocating energy reserve facility
• Brigg Battery 2 hour duration
• Brigg Battery 2 hour duration. Lower Connection Capacity takes in to account degradation of capacity in year 6 of operation.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
30.29 MW
Sand Quarry Old Glasgow Road, Land south east of B788, Kilwinning, KA13 7QN (1 component)

Front of meter BESS plant. The Connection Capacity stated is lower than the BESS capacity and the connection agreement - this is to allow for degradation of the battery over …

Active • 2029-30
14.73 MW
RYE COMMON LANE, BLUE BELL LODGE, RYE COMMON LANE, CRONDALL, FARNHAM, SURREY, GU10 5DE . (3 components)
• New Build 2-hour Battery Storage site
• New Build Battery Storage Site.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
50.49 MW
Loading map...
Showing 25 locations