Storage (Duration 2h)

171 unique locations (910 components) - Page 1 of 7

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (4 components)
• Two hour duration battery storage (2)
• Two duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
42.14 MW
Wise Warren Farm, Warren Lane, Tadcaster, LS24 9NU (1 component)

A new-build energy storage site

Storage (Duration 2h) HARMONY BH LIMITED New Build Generating CMU Bramham BESS Not Prequalified LS24
Active • 2027-28 (T-4)
4.31 MW
Widow Hill, Balderstone Lane, Burnley, BB10 2TA (1 component)

70MW BESS installation made up of 38 units of 4MW batteries - resulting in a storage capacity of >2 hours.

Storage (Duration 2h) P3P ENERGY MANAGEMENT LIMITED New Build Generating CMU Widow Hill BESS Not Prequalified BB10
Active • 2027-28 (T-4)
10.77 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (6 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Whaddon Farm BESS Whaddon Farm Solar Park BA14
Active • 2029-30 (T-4), 2027-28 (T-4) ...
7.89 MW
Wansborough Paper Mill, Watchet, Somerset, TA23 0AY (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (WATCHET) LIMITED New Build Generating CMU Watchet TA23
Active • 2027-28 (T-4)
1.64 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (5 components)
• New build 49.995MW / 99.990 MWh battery energy storage system. (2)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
Active • 2029-30 (T-4), 2027-28 (T-4) ...
34.27 MW
Tyne Tunnel Industrial Estate, North Shields, Tyne & Wear, NE29 7SE (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Flatworth Not Prequalified NE29
Active • 2027-28 (T-4)
5.34 MW
Tredington Fields Farm, Claydon Solar B, Tredington, Tewkesbury, GL20 7BS (3 components)

Battery Storage (2)

Active • 2027-28 (T-4), 2026-27 (T-1) ...
6.20 MW
Todrig Farm, Coldstream, TD12 4JA (5 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and … (2)

Storage (Duration 2h) ECCLES ENERGY CENTRE LIMITED Eccles Energy Centre Limited Eccles Energy Centre Limited TD12
Active • 2028-29 (T-4), 2027-28 (T-4)
148.15 MW
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
32.54 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (6 components)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. (2)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is currently in construction and due to be operational in Q4 ?23.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
30.29 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (15 components)
• New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
• New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
Storage (Duration 2h) Storage (Duration 4h) THORPE MARSH GREEN ENERGY HUB LIMITED Thorpe Marsh BESS 1 Thorpe Marsh BESS 1 (2024) +13 more DN6
Active • 2028-29 (T-4), 2027-28 (T-4)
799.82 MW
The Manorway, Stanford-le-Hope, SS17 9LL (9 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.94 MW
The land South-West of the Dunoon Electrical Substation located on Ardnadam Farm, Sandbank, Dunoon, Argyll and Bute, PA23 8PN (2 components)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works. (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
12.94 MW
The land at Rownall Hall Farm, Rownall Road, Wetley Rocks, Stoke-on-Trent, ST9 0BS (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 300MW, located in Stoke.

Storage (Duration 2h) C & S ENERGY LIMITED New Build Generating CMU Cellarhead BESS ST9
Active • 2027-28 (T-4)
31.54 MW
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Storage (Duration 2h) CONRAD (SWINDON) LIMITED New Build Generating CMU Swindon Swindon +2 more SN3
Active • 2027-28 (T-4), 2025-26 (T-1) ...
10.59 MW
Surteco UK Ltd, Widow Hill Road, Burnley, BB10 2TB (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Burnley C Not Prequalified BB10
Active • 2027-28 (T-4)
2.63 MW
St Philips Energy Storage Facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (4 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (ST PHILIPS) LIMITED New Build Generating CMU St Philips BS2
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4.29 MW
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (2 components)

The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.

Storage (Duration 2h) SSE UTILITY SOLUTIONS LIMITED New Build Generating CMU Staythorpe BESS Not Prequalified NG23
Active • 2029-30 (T-4), 2027-28 (T-4)
132.07 MW
Station Road, Southfleet, Dartford, Kent, England, DA13 9PA, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Storage (Duration 2h) CSE41 Limited New Build Generating CMU Northfleet41 Not Prequalified DA13
Active • 2027-28 (T-4)
46.02 MW
Star Inn Farm, Land off the Main Street, Invergowrie, Perth and Kinross, Scotland, DD2 5EG, United Kingdom (1 component)

2 hour Battery Energy Storage System

Storage (Duration 2h) SUNSHINE PROJECT 01 LIMITED New Build Generating CMU Sunshine Project 01 Not Prequalified DD2
Active • 2027-28 (T-4)
7.68 MW
Stammery Hill, Sector, Axminster, East Devon, Devon, England, EX13 5UH, United Kingdom (1 component)

The proposed power plant would consist of a number new highly efficient lithium-ion battery units plus ancillary equipment. Each genset is based on advanced battery technology.

Storage (Duration 2h) CSE25 Limited New Build Generating CMU Axminster25 Not Prequalified EX13
Active • 2027-28 (T-4)
22.93 MW
Speke Hall Avenue, Speke, Liverpool, L24 8DA (4 components)
• A new build, battery energy storage system (2)
• A new build, gas fueled generation station.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
8.81 MW
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (3 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bolton A Bolton A Not Prequalified BL5
Active • 2029-30 (T-4), 2028-29 (T-4) ...
6.33 MW
Shipley Road, Goffsland Farm, Shipley, Horsham, West Sussex, England, RH13 8PA, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Storage (Duration 2h) CSE43 Limited New Build Generating CMU Knepp43 Not Prequalified RH13
Active • 2027-28 (T-4)
61.41 MW
Loading map...
Showing 25 locations