Storage (Duration 2h)

44 unique locations (208 components) - Page 1 of 2

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Ashorne Solar, Chesterton Fields Farm, Fosse Way, Ashorne Hill, CV33 9JY (3 components)

Battery Storage

Active • 2029-30 (T-4), 2028-29 (T-4) ...
6.20 MW
B970, Boat of Garten, Highland, Scotland, PH24 3BY, United Kingdom (2 components)

New build 49.9MW / 99.8MWh battery energy storage system

Active • 2027-28 (T-4), 2026-27 (T-1)
18.20 MW
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (4 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (BASINGSTOKE) LIMITED New Build Generating CMU Basingstoke Basingstoke +1 more RG24
Active • 2027-28 (T-4), 2026-27 (T-1) ...
12.96 MW
Birch Road, Colchester CO2 0EJ (3 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Layer 2 BESS Layer 2 BESS CO2
Active • 2027-28 (T-4), 2026-27 (T-1) ...
16.81 MW
Church Road, Chelmsford, CM2 8UN (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Sandon Brook BESS CM2
Active • 2027-28 (T-4), 2026-27 (T-1)
12.61 MW
Eccles Birgham Farm, TD12 4LU (16 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Kilmarnock South unit 1 Kilmarnock South unit 2 TD12
Active • 2027-28 (T-4), 2026-27 (T-4) ...
326.52 MW
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (4 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.

Storage (Duration 2h) SSE FERRYBRIDGE BATTERY LIMITED SSE UTILITY SOLUTIONS LIMITED New Build Generating CMU Ferrybridge BESS Ferrybridge BESS +1 more WF11
Active • 2027-28 (T-4), 2026-27 (T-4) ...
126.78 MW
Former Sanmex Site, Land at Dalmarnock Road, Rutherglen, South Lanarkshire, G73 1NY (4 components)
• New Build Battery Storage
• New build battery Storage
Active • 2029-30 (T-4), 2028-29 (T-4) ...
39.12 MW
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (4 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5-hour BESS site
Active • 2027-28 (T-4), 2026-27 (T-1) ...
27.76 MW
Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2026-27 (T-4), 2026-27 (T-1) ...
3.55 MW
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation, G74 4GY (3 components)

Standalone battery storage system connecting at 33kV to the East Killbride substation

Active • 2027-28 (T-4), 2026-27 (T-1) ...
32.13 MW
KIMPTON WOOD SOLAR FARM, SHODDESDEN GRANGE, GREAT SHODDESDEN, ANDOVER SP11 9LP (3 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Kimpton BESS Kimpton BESS SP11
Active • 2027-28 (T-4), 2026-27 (T-1) ...
5.80 MW
Land 90 Metres South West Of Noahs Ark Old Gallows Road, Perth PH1 1QE (3 components)
• 2 hours Lithium-In battery storage facility in Scotland connected to the distribution network with a connection capacity of 49.4MW
• 49.9 MW standalone battery energy storage project.
Active • 2027-28 (T-4), 2026-27 (T-1) ...
31.05 MW
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (4 components)
• New Build Battery Storage
• New build battery storage
Storage (Duration 2h) ALCEMI STORAGE DEVELOPMENTS 4 LIMITED New Build Generating CMU COALB1 COALB1 +1 more ML11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
333.77 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, South Gloucestershire, BS37 9TX (5 components)
• A 25MW Battery Energy Storage System.
• A 47.5MW Battery Energy Storage System.
• A Battery Energy Storage System.
Storage (Duration 2h) Storage (Duration 2.5h) HD000ACT LTD New Build Generating CMU Fairholme Minety BS37
Active • 2029-30 (T-4), 2027-28 (T-4) ...
37.53 MW
land at Keelings Road, Southminster, CM0 7JF (6 components)
• New build generating CMU component known as Dengie BESS
• New build generating CMU component known as Dengie Solar Park
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Dengie BESS Dengie Solar Park Not Prequalified CM0
Active • 2029-30 (T-4), 2027-28 (T-4) ...
5.55 MW
Land at Mill Hill Substation, Partingdale Road, Barnet, NW7 1NT (4 components)
• A 57.000MW Battery Energy Storage System.
• A Battery Energy Storage System.
Storage (Duration 2h) Storage (Duration 2.5h) HB333MIL LTD New Build Generating CMU Mill Hill Mill Hill +1 more NW7
Active • 2027-28 (T-4), 2026-27 (T-4) ...
41.68 MW
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (3 components)

Lithium-based battery energy storage system.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
32.25 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL (13 components)
• Battery Storage Plant
• Battery Storage plant
• Gas reciprocating engines
• ... and 2 more unique descriptions
Reciprocating engines Storage (Duration 2h) Open Cycle Gas Turbine (OCGT) THURROCK STORAGE LIMITED New Build Generating CMU Thurrock Storage Limited Thurrock Storage Limited +2 more RM18
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1089.05 MW
Land East of Langford Mill and Tye Farm, Langford, Devon, EX15 2JY (3 components)
• Battery Storage
• Battery storage
Active • 2027-28 (T-4), 2026-27 (T-1) ...
19.07 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application), Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Storage (Duration 1h) Storage (Duration 2h) FP LUX SCURF DYKE SOLAR LIMITED Scurf Dyke Solar Limited Scurf Dyke Solar Limited YO25
Active • 2027-28 (T-4), 2026-27 (T-4) ...
20.72 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (7 components)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
Storage (Duration 2h) Storage (Duration 1.5h) GRIDSOURCE (WOBURN RD) LIMITED New Build Generating CMU Woburn Road Woburn Road +2 more MK43
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.88 MW
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (5 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity". Please note that the Appendix C and grid documents refer to a battery and solar unit ("Power Station") connected at the same connection point. No applications will be submitted for the solar unit in the 2025 pre-qualification and it does not have a capacity market agreement from previous auctions. Therefore, the site is not a multi-unit site, in line with paragraph 2.1.1 on page 3 of the NESO guidance document "Multi-Unit Sites". Under rule 3.5.1A, the connection capacity used in future applications for the solar unit will be defined to ensure that the aggregate connection capacity does not exceed the total TEC stated in the Connection Agreement. The approach taken is in line with paragraph 3.2.8 on page 8 of the NESO guidance document "Connection Arrangement and Agreements".
Active • 2027-28 (T-4), 2026-27 (T-4) ...
47.33 MW
Land north west of Bredbury Substation, Welkin Road, Bredbury, Stockport, SK6 2BS (5 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity".
Storage (Duration 2h) Storage (Duration 9h) PIVOTED POWER LLP Pivot Power Bredbury Pivot Power Bredbury +2 more SK6
Active • 2027-28 (T-4), 2026-27 (T-4) ...
39.48 MW
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (4 components)
• A 99.800MW Battery Energy Storage System. The BESS is 200KW less than the connection capacity due to sizing of the system.
• A Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 2.5h) HD192RAY LTD New Build Generating CMU Rayleigh Rayleigh +1 more SS11
Active • 2027-28 (T-4), 2026-27 (T-4) ...
72.97 MW
Loading map...
Showing 25 locations