Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

44 unique locations (208 components) - Page 1 of 2

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (4 components)
• Two hour duration battery storage (2)
• Two duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
42.14 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (6 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Whaddon Farm BESS Whaddon Farm Solar Park BA14
Active • 2029-30 (T-4), 2027-28 (T-4) ...
7.89 MW
West House Farm, Scruton, Northallerton, DL7 0RQ (2 components)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Storage (Duration 2h) LEEMING SOLAR FARM LIMITED New Build Generating CMU Leeming Solar Farm BESS DL7
Active • 2028-29 (T-4), 2026-27 (T-1)
8.67 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (5 components)
• New build 49.995MW / 99.990 MWh battery energy storage system. (2)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
Active • 2029-30 (T-4), 2027-28 (T-4) ...
34.27 MW
Tredington Fields Farm, Claydon Solar B, Tredington, Tewkesbury, GL20 7BS (3 components)

Battery Storage (2)

Active • 2027-28 (T-4), 2026-27 (T-1) ...
6.20 MW
The Manorway, Stanford-le-Hope, SS17 9LL (9 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.94 MW
Stevensons Farm, Arterial Road, Nevendon, Essex, SS14 3JH (10 components)

Electro-Chemical Battery Energy Storage System (BESS)

Storage Storage (Duration 2h) Storage (Duration 0.5h) NEVENDON ENERGY STORAGE LTD New Build Generating CMU NEVENDON Energy Store 10 Ltd 10.0 Rejected SS14
Active • 2026-27 (T-1), 2025-26 (T-4) ...
1.82 MW
Smithyard Lane, Watchet, TA4 4NN (2 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (WATCHET) LIMITED New Build Generating CMU Watchet TA4
Active • 2026-27 (T-1), 2025-26 (T-1)
7.16 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (5 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.11 MW
136.34 MW
Rabys Farm, Bilsborrow Lane, Bilsborrow, Preston, Lancashire, PR3 0RP (2 components)

New build battery storage

Active • 2028-29 (T-4), 2026-27 (T-1)
21.67 MW
Pikevy Farm, Glenrothes, Fife, KY6 3HD (3 components)

This is a 49.9MW battery storage facility connected at 33kV.

Active • 2027-28 (T-4), 2026-27 (T-1) ...
33.58 MW
Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG (3 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Shaftesbury BESS Shaftesbury BESS SP8
Active • 2027-28 (T-4), 2026-27 (T-1) ...
12.08 MW
Overhill Farm, Rothienorman, Scotland, AB51 8YN (3 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2.5 hours.
• New build 2-hour Battery storage site
Active • 2027-28 (T-4), 2026-27 (T-1) ...
37.73 MW
Netherton Farm, Keith AB55 5PE (16 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE BLACKHILLOCK LIMITED New Build Generating CMU Blackhillock Blackhillock +2 more AB55
Active • 2029-30 (T-4), 2026-27 (T-4) ...
194.43 MW
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (3 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.

Storage (Duration 2h) SSE BATTERY MONK FRYSTON LIMITED SSE UTILITY SOLUTIONS LIMITED New Build Generating CMU Monk Fryston BESS Phase 1 Monk Fryston BESS Phase 1 LS25
Active • 2027-28 (T-4), 2026-27 (T-4) ...
190.38 MW
Link Road, Launceston, Cornwall, PL15 9LP England (4 components)
• New-Build Li-Ion BESS, 2hr duration.
• Recently-commissioned, existing Li-Ion BESS, 2hr duration.
Storage (Duration 2h) GRIDBEYOND LIMITED New Build Generating CMU PL15
Active • 2028-29 (T-4), 2026-27 (T-1) ...
2.13 MW
Land west of Roman Camp Road, Calderwood, Broxburn, West Lothian, EH52 5PF (3 components)

Standalone battery storage system connecting at 33kV to the Broxburn substation

Active • 2027-28 (T-4), 2026-27 (T-1) ...
32.13 MW
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (3 components)
• 47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site.
• Battery energy storage site with 47.5MW capacity located at Indian Queens substation.
Storage (Duration 2h) Storage (Duration 1.5h) SAMBAR POWER LIMITED New Build Generating CMU Indian Queens BESS Indian Queens BESS 1 PL26
Active • 2027-28 (T-4), 2026-27 (T-1) ...
31.30 MW
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (4 components)
• A 99.800MW Battery Energy Storage System. The BESS is 200KW less than the connection capacity due to sizing of the system.
• A Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 2.5h) HD192RAY LTD New Build Generating CMU Rayleigh Rayleigh +1 more SS11
Active • 2027-28 (T-4), 2026-27 (T-4) ...
72.97 MW
Land north west of Bredbury Substation, Welkin Road, Bredbury, Stockport, SK6 2BS (5 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity".
Storage (Duration 2h) Storage (Duration 9h) PIVOTED POWER LLP Pivot Power Bredbury Pivot Power Bredbury +2 more SK6
Active • 2027-28 (T-4), 2026-27 (T-4) ...
39.48 MW
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (5 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity". Please note that the Appendix C and grid documents refer to a battery and solar unit ("Power Station") connected at the same connection point. No applications will be submitted for the solar unit in the 2025 pre-qualification and it does not have a capacity market agreement from previous auctions. Therefore, the site is not a multi-unit site, in line with paragraph 2.1.1 on page 3 of the NESO guidance document "Multi-Unit Sites". Under rule 3.5.1A, the connection capacity used in future applications for the solar unit will be defined to ensure that the aggregate connection capacity does not exceed the total TEC stated in the Connection Agreement. The approach taken is in line with paragraph 3.2.8 on page 8 of the NESO guidance document "Connection Arrangement and Agreements".
Active • 2027-28 (T-4), 2026-27 (T-4) ...
47.33 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (7 components)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
Storage (Duration 2h) Storage (Duration 1.5h) GRIDSOURCE (WOBURN RD) LIMITED New Build Generating CMU Woburn Road Woburn Road +2 more MK43
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.88 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application), Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Storage (Duration 1h) Storage (Duration 2h) FP LUX SCURF DYKE SOLAR LIMITED Scurf Dyke Solar Limited Scurf Dyke Solar Limited YO25
Active • 2027-28 (T-4), 2026-27 (T-4) ...
20.72 MW
Land East of Langford Mill and Tye Farm, Langford, Devon, EX15 2JY (3 components)
• Battery Storage
• Battery storage
Active • 2027-28 (T-4), 2026-27 (T-1) ...
19.07 MW
Loading map...
Showing 25 locations