Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

91 unique locations (436 components) - Page 1 of 4

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (20 components)
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load. (2)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
867.73 MW
Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Poulton Power FY6
Active • 2025-26 (T-4)
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (3 components)

12MW 24MWh battery storage located at Brindley Close in Swindon (3)

Storage (Duration 2h) Zenobe Brindley Limited New Build Generating CMU Brindley_21 Brindley_21 +1 more SN2
Active • 2025-26 (T-4), 2024-25 (T-1) ...
7.16 MW
The Manorway, Stanford-le-Hope, Essex, SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Storage (Duration 2h) Open Cycle Gas Turbine (OCGT) GATEWAY ENERGY CENTRE LIMITED Gateway Energy Centre Limited Gateway Energy Centre Limited +9 more SS17
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
The Common, Malmesbury, SN16 9RJ (2 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 1h) Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Malmesbury Malmesbury Not Prequalified SN16
Active • 2026-27 (T-4), 2025-26 (T-4)
7.08 MW
Stevensons Farm, Arterial Road, Nevendon, Essex, SS14 3JH (10 components)

Electro-Chemical Battery Energy Storage System (BESS)

Storage Storage (Duration 2h) Storage (Duration 0.5h) NEVENDON ENERGY STORAGE LTD New Build Generating CMU NEVENDON Energy Store 10 Ltd 10.0 Rejected SS14
Active • 2026-27 (T-1), 2025-26 (T-4) ...
1.82 MW
South of Carnegie Road, Liverpool, L13 3AT (1 component)

New build battery storage

Storage (Duration 2h) LISTER BATTERY LTD New Build Generating CMU Lister L13
Active • 2025-26 (T-4)
308.46 MW
Scawby Brook, Brigg, Lincolnshire DN20 9LT (9 components)
• A Prospective New Build Gas reciprocating energy reserve facility
• Brigg Battery 2 hour duration
• Brigg Battery 2 hour duration. Lower Connection Capacity takes in to account degradation of capacity in year 6 of operation.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
30.29 MW
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom (2 components)
• The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.
• The CMU is a Battery Energy Storage System with a planned 49.9MW active power output, consisting of containerised batteries.
Storage (Duration 2h) SSE BATTERY SALISBURY LIMITED New Build Generating CMU Salisbury BESS Salisbury BESS SP2
Active • 2025-26 (T-4), 2024-25 (T-1)
9.98 MW
RWE Generation UK plc, Cheshire Power Station, North Road, Ellesmere Port, Cheshire, CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel.

Storage (Duration 2h) RWE GENERATION UK PLC CMU_CHES21 CMU_CHES21 Not Prequalified CH65
Active • 2026-27 (T-4), 2025-26 (T-4)
3.55 MW
Rusholme Grange, Drax, YO8 8PW (3 components)
• Lithium-ion Battery Energy Storage System
• New build 35MW Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY RH LTD New Build Generating CMU HRHL21 Rusholme BESS +1 more YO8
Active • 2025-26 (T-4), 2024-25 (T-1) ...
20.89 MW
Royle Farm, Burton upon Trent, Derbyshire, DE15 9TU (2 components)
• A 90 MW battery storage system comprising approx 11 battery skid units units at Royle Farm Business Park
• Containerised battery storage asset, 2 hour duration
Storage (Duration 1h) Storage (Duration 2h) ALUDRA BESS LTD New Build Generating CMU ALUDRA BESS LTD (Drakelow) DE15
Active • 2026-27 (T-4), 2025-26 (T-4)
21.27 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 003 LIMITED New Build Generating CMU Royle Barn Road Royle Barn Road +3 more OL11
Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.13 MW
23.21 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.69 MW
Overlea Farm , New Mills, High Peak, Stockport SK22 4QJ (1 component)
Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Overlea Not Prequalified SK22
Active • 2025-26 (T-4)
Ordsall Lane, Ordsall, Salford Quays, Salford, M5 3NB (2 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) WESSEX ENERGY STORAGE LTD New Build Generating CMU Not Prequalified M5
Active • 2025-26 (T-4)
North of Hull Rd, Osbaldwick, York, YO10 3JA (2 components)

New build battery storage.

Active • 2025-26 (T-4)
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (6 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2026-27 (T-4), 2025-26 (T-4)
6.29 MW
Mill Hill Farm, Woodend Road, Poynton, SK12 1EG (3 components)
• A 40.000MW Battery Energy Storage System.
• A Battery Energy Storage System
Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Hazel Grove Poynton Battery Not Prequalified SK12
Active • 2029-30 (T-4), 2025-26 (T-4)
8.79 MW
Mill Hill Farm, Hazel Grove, SK12 1EG (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Bramhall Not Prequalified SK12
Active • 2025-26 (T-4)
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
• New build one-hour duration storage to replace diesel plant
• New build two-hour duration storage to replace diesel plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.62 MW
Lowfields Way, Lowfields Business Park, HX5 9DA (5 components)
• BATTERY STORAGE PLANT
• New build battery storage
• New build generating storage unit
Storage (Duration 2h) UK BATTERY STORAGE LTD GREENGRIDPOWER1 LTD New Build Generating CMU Elland Elland +2 more HX5
Active • 2028-29 (T-4), 2025-26 (T-4) ...
51.32 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (12 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM EAST STORAGE LIMITED New Build Generating CMU Melksham East Storage1 Melksham East Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.74 MW
Loading map...
Showing 25 locations