Storage (Duration 2h)

5 unique locations (22 components)

Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (3 components)
• 6 CHP engines of 1.5MW each. Primary fuel type = Natural Gas
• A Battery Energy Storage System
Active • 2025-26 (T-1), 2020-21 (T-4)
30.95 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (3 components)
• Load drop
• New Build 2 hour battery storage system.
• New Build 2.5 hour battery storage system.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
15.20 MW
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)
• Sixteen POSGUs (standby diesel generators).
• This is a 49.99MW battery storage facility connected at 33kV.
• to be provided once CMU Components are known
Active • 2025-26 (T-1), 2020-21 (T-4)
13.16 MW
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (8 components)
• Existing CMU comprising of battery storage and associated plant
• Gas reciprocating engines.
• New Build CMU comprising of battery storage and associated plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
34.25 MW
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (5 components)
• Gas generation peaking plant comprising of 9 x 2MW engines
• Two hour duration battery storage
Active • 2028-29 (T-4), 2025-26 (T-1) ...
41.75 MW
Loading map...