Storage (Duration 2h)

24 unique locations (343 components)

West Marsh Road Spalding Lincolnshire PE11 3BB (15 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2019-20 (T-1), 2022-23 (T-4) ...
259.70 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (22 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2022-23 (T-1), 2022-23 (T-3) ...
66.68 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (2 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
Active • 2023-24 (T-4), 2024-25 (T-4)
24.31 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (15 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2023-24 (T-1), 2023-24 (T-4) ...
71.09 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (12 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• Battery Energy Storage facility
Active • 2023-24 (T-1), 2023-24 (T-4) ...
106.91 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (6 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 50MW New Build Battery Storage site
Active • 2022-23 (T-3), 2023-24 (T-1) ...
31.39 MW
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
• A new build 19MW battery energy storage system
• A new build 20MW battery energy storage system
Active • 2021-22 (T-4), 2022-23 (T-3) ...
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (6 components)
• A 48MW battery energy storage system
• A 49.5MW battery energy storage system
Active • 2021-22 (T-4), 2022-23 (T-3) ...
18.04 MW
LAND ON THE EAST SIDE OF CORONATION SQUARE ARDWICK M12 6EL (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
2.46 MW
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
Active • 2022-23 (T-3), 2022-23 (T-4) ...
6.80 MW
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
Land at Sterte Avenue West, Poole, BH15 2AL (24 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
Active • 2022-23 (T-4), 2023-24 (T-1) ...
11.01 MW
LAND AT DUNHAMS LANE LETCHWORTH GARDEN CITY SG6 1JH (2 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
4.92 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (18 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
Active • 2023-24 (T-4), 2024-25 (T-1) ...
156.98 MW
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (11 components)
• A new build 10MW battery storage system
• A new build 11MW battery storage system
Active • 2022-23 (T-3), 2022-23 (T-4) ...
13.52 MW
Land at Axminster Substation, Pound Road, Axminster, Devon, EX13 5RX (3 components)
• A Battery Energy Storage System
• A Battery Energy Storage System.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
51.77 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (8 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• 49.9MW Battery Energy Storage facility
Active • 2022-23 (T-4), 2023-24 (T-1) ...
91.06 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (125 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2024-25 (T-4), 2025-26 (T-4) ...
5209.30 MW
Clay Tye Road, Upminister, RM14 3PL (13 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Active • 2022-23 (T-3), 2022-23 (T-4) ...
100.45 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (18 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Active • 2022-23 (T-3), 2022-23 (T-4) ...
91.05 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (9 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Active • 2022-23 (T-3), 2022-23 (T-4) ...
75.39 MW
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (7 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2020-21 (T-1), 2022-23 (T-3) ...
9.68 MW
Loading map...
Showing 24 locations