Storage (Duration 2h)

41 unique locations (220 components) - Page 1 of 2

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
WHITLEY GOLF COURSE CORSHAM ROAD, SHAW, MELKSHAM SN12 8EQ. (Nearest postcode to grid reference: SN12 8EH). (10 components)

Battery Storage Plant (3)

Storage Storage (Duration 2h) MELKSHAM WEST STORAGE LIMITED MELKSHAM EAST STORAGE LIMITED MELKSHAM WEST STORAGE LIMITED +1 more New Build Generating CMU Melksham East Storage Melksham East Storage 010 +4 more SN12
Active • 2024-25 (T-4), 2023-24 (T-4) ...
West Marsh Road Spalding Lincolnshire PE11 3BB (13 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is … (3)

Storage (Duration 2h) Storage (Duration 4h) SPALDING ENERGY PARK LIMITED New Build Generating CMU SPBB18 SPBC18 +7 more PE11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Reciprocating engines Storage (Duration 2h) STOR 108 LTD HAMILTON LANE POWER LIMITED New Build Generating CMU Hamilton Hamilton +3 more OL4
Active • 2026-27 (T-4), 2024-25 (T-1) ...
25.00 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (9 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY CS LIMITED New Build Generating CMU CONTEGO CONTEGO +3 more BN6
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Storage (Duration 2h) Open Cycle Gas Turbine (OCGT) GATEWAY ENERGY CENTRE LIMITED New Build Generating CMU Gateway Energy Centre Limited Gateway Energy Centre Limited +9 more SS17
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
Stonehill, Charlton, Malmesbury, SN16 9RP (1 component)

49.900MW OF BATTERY ENERGY STORAGE SYSTEMS

Active • 2024-25 (T-4)
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (6 components) Geocoding Needed
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station. (2)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Storage Storage (Duration 2h) VATTENFALL WIND POWER LTD New Build Generating CMU Battery@Ray Battery@Ray +2 more
Active • 2024-25 (T-1), 2024-25 (T-4) ...
11.94 MW
Mannington Depot, Telford Way, Swindon, SN5 8BA (2 components)

A Battery Energy Storage System (2)

Storage (Duration 2h) SW MANNINGTON LIMITED New Build Generating CMU Mannington Mannington SN5
Active • 2024-25 (T-4), 2022-23 (T-1)
Mannington Depot, Mannington Depot Service Road Mannington Swindon SN5 8BA (1 component)

A Battery Energy Storage System.

Storage (Duration 2h) SW MANNINGTON LIMITED New Build Generating CMU Mannington SN5
Active • 2024-25 (T-4)
Little Raith Farm, Auchtertool, Fife, KY5 0AX (7 components)
• 49.5MW Battery Energy Storage facility (2)
• Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HEIT LR LIMITED New Build Generating CMU LR22 LR22 +3 more KY5
Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.43 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR WELKIN MILL LIMITED New Build Generating CMU Welkin Mill 1 Welkin Mill 1 +5 more SK6
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.93 MW
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
• A new build 20MW battery energy storage system (2)
• A new build 19MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT FM LIMITED New Build Generating CMU FARNHAM FARNHAM +2 more Not Prequalified GU10
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
• A 49.5MW battery energy storage system (2)
• A 48MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) LIMITED New Build Generating CMU PILLSWOOD PILLSWOOD +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT). (5 components)

Battery Storage Plant (3)

Storage Storage (Duration 1h) Storage (Duration 2h) WEST DIDSBURY STORAGE LIMITED WEST DIDSBURY STORAGE LIMITED New Build Generating CMU West Didsbury Storage West Didsbury Storage 017 +1 more M33
Active • 2024-25 (T-4), 2023-24 (T-4) ...
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (11 components)

Battery Storage Plant (3)

Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 4h) ENDERBY STORAGE LIMITED ENDERBY STORAGE LIMITED New Build Generating CMU Enderby Storage 019 Enderby Storage 042 +6 more LE19
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.76 MW
LAND ON THE EAST SIDE OF CORONATION SQUARE ARDWICK M12 6EL (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Coronation Power Not Prequalified M12
Active • 2024-25 (T-4)
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 30MW battery energy storage system (2)
• A new build 29MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HARMONY JF LIMITED New Build Generating CMU JAMESFIELD JAMESFIELD +3 more KY14
Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.80 MW
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Bustleholm WS5
Active • 2024-25 (T-4)
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Coventry CV2
Active • 2024-25 (T-4)
Land at Whitegate Substation, Broadgate, Oldham, OL9 9XA (3 components)
• A Battery Energy Storage System. (2)
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD144WHI LTD New Build Generating CMU Whitegate Whitegate +1 more OL9
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.92 MW
Land at Ocker Hill Substation, Power Way, Tipton, DY4 0PW (3 components)
• A Battery Energy Storage System. (2)
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD143OCK LTD New Build Generating CMU Ocker Hill Ocker Hill +1 more DY4
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.92 MW
Land at Monk Fryston Substation, Rawfield Lane, Leeds, LS25 5JD (3 components)
• A Battery Energy Storage System
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant
Reciprocating engines Storage (Duration 2h) HD777FRY LTD New Build Generating CMU Fryston Fryston +1 more Not Prequalified LS25
Active • 2025-26 (T-4), 2024-25 (T-4)
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (3 components)
• A Battery Energy Storage System (2)
• A gas fuelled generating station.
Reciprocating engines Storage (Duration 2h) HD639LEG LIMITED New Build Generating CMU Fryston Legacy +1 more LL14
Active • 2026-27 (T-4), 2025-26 (T-1) ...
28.95 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (2 components)
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD000ACT LTD New Build Generating CMU Iron Acton Iron Acton 2 Rejected BS37
Active • 2027-28 (T-4), 2024-25 (T-4)
10.79 MW
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System. (2)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.46 MW
Loading map...
Showing 25 locations