Storage (Duration 2h)

56 unique locations (249 components) - Page 1 of 3

Active MW: 0.00 MW
Inactive MW: 0.00 MW
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom (2 components)

29.9MW/29.9MWh one hour battery

Active • 2026-27 (T-4), 2024-25 (T-1)
10.31 MW
Aikengall 2a Wind Farm, Innerwick, EH42 1SG (2 components)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.

Active • 2027-28 (T-4), 2024-25 (T-1)
18.03 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (7 components)
• Battery storage plant
• Existing generating battery storage unit.
Storage (Duration 1h) Storage (Duration 2h) ARBROATH LIMITED New Build Generating CMU Arbroath 17.5MW 2hour BESS Arbroath 17.5MW 2hour BESS +4 more DD11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.89 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC1
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
Storage (Duration 2h) FIELD AUCHTERAW LTD. New Build Generating CMU FIELD AUCHTERAW FIELD AUCHTERAW +2 more PH32
Active • 2026-27 (T-4), 2025-26 (T-1) ...
49.76 MW
Blandford Road, Poole, BH16 6AB (4 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR BLANDFORD ROAD LIMITED New Build Generating CMU Poise 1 Poise 1 +1 more BH16
Active • 2026-27 (T-4), 2025-26 (T-1) ...
23.04 MW
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (4 components)

A Battery Energy Storage System.

Storage (Duration 2h) KXP IMMINGHAM LIMITED New Build Generating CMU Immingham Immingham +2 more DN41
Active • 2026-27 (T-4), 2025-26 (T-1) ...
77.66 MW
Bumpers 2 BESS, Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A new build battery energy storage system

Storage (Duration 2h) HEIT BF LIMITED New Build Generating CMU Bumpers 2 ESS HP27
Active • 2024-25 (T-1)
11.11 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (6 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CF LIMITED New Build Generating CMU CHAPELFARM CHAPELFARM +3 more LU4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
29.21 MW
Colton Farm Lochead Dunfermline Fife, KY 10. This address and pincode was used for grid correspondence. However, the site`s own post-code is yet to be identified. We will notify the DB as soon as it is available., Please see the cover letter for more details. (5 components) Geocoding Needed
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
• Solar generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
Active • 2026-27 (T-4), 2024-25 (T-1)
39.67 MW
Craigton Interchange, Linburn, Bishopton, Renfrewshire, Scotland, PA7 5NT, United Kingdom (3 components)

30MW/30MWh one hour battery

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Farburn?Place, Dyce, Aberdeen, AB21 7GP (3 components)
• 30 MW, 2 hour duration battery storage systems is to be installed. Capacity reduced to 28MW to allow for degradation in DY 28/29 for Extended Performance Test. Please see a cover letter for more details.
• Battery Storage 2 hour duration
Active • 2029-30 (T-4), 2026-27 (T-4) ...
20.04 MW
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (7 components)

CMU to comprise multiple individual storage units metered and despatched centrally

Active • 2026-27 (T-4), 2025-26 (T-4) ...
66.67 MW
Harrop Lane, Hare Croft, Wilsden, Bradford, West Yorkshire, BD15 0BZ (3 components)

New build battery storage.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
45.36 MW
10.20 MW
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (12 components)
• Battery Storage Plant
• Gas peaking reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.76 MW
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (3 components)

This is a 99.9MW battery storage facility connected at 132kV.

Active • 2026-27 (T-4), 2025-26 (T-1) ...
69.01 MW
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (4 components)
• Battery Energy Storage System
• Energy Storage Site
• New Build 33 MW Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HEIT WG LIMITED New Build Generating CMU Wormald Green BESS Wormald Green ESS +1 more HG3
Active • 2026-27 (T-4), 2025-26 (T-1) ...
30.43 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components)
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
Reciprocating engines Storage (Duration 2h) HD888CAP LIMITED New Build Generating CMU CAPENHURST CAPENHURST +2 more CH66
Active • 2025-26 (T-4), 2024-25 (T-4) ...
12.92 MW
LAND AT DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB (Nearest Postcode: SS11 8UA). (9 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 3h) DOLLYMANS STORAGE LIMITED New Build Generating CMU Dollymans Storage Dollymans Storage +4 more SS11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
28.86 MW
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.46 MW
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE (3 components)

Lithium-based battery energy storage system.

Active • 2026-27 (T-4), 2025-26 (T-1) ...
33.80 MW
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP (4 components)

This is a 20MW battery storage facility connected at 33kV.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.71 MW
Land at Jamesfield Farm, Abernethy, Fife, KY14 6EW (2 components)

A new build 19MW battery energy storage system

Active • 2025-26 (T-4), 2024-25 (T-1)
4.31 MW
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (4 components)
• 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
• 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
• 49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
Storage (Duration 2h) Zenobe Wishaw Limited New Build Generating CMU Wishaw Wishaw +1 more ML2
Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.82 MW
Land at Ocker Hill Substation, Power Way, Tipton, DY4 0PW (3 components)
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD143OCK LTD New Build Generating CMU Ocker Hill Ocker Hill +1 more DY4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
12.92 MW
Loading map...
Showing 25 locations