Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

8 unique locations (59 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (3 components)
β€’ A New Build Gas fuelled power plant at Kirkby substation.
β€’ A New Build Transmission Connected Battery Energy Storage System.
Reciprocating engines Storage (Duration 2h) KIRKBY BATTERY STORAGE LTD New Build Generating CMU KIRKBY Kirkby BESS L33
Active β€’ 2027-28 (T-4), 2023-24 (T-4) ...
7.62 MW
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (19 components)
β€’ Battery storage unit
β€’ New reciprocating gensets in acoustic enclosure
β€’ Reciprocating genset in acoustic enclosure
Reciprocating engines Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Fulwood Rd Fulwood Road - Battery +2 more NG17
Active β€’ 2025-26 (T-4), 2023-24 (T-4) ...
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT). (5 components)

Battery Storage Plant

Storage Storage (Duration 1h) Storage (Duration 2h) WEST DIDSBURY STORAGE LIMITED New Build Generating CMU West Didsbury Storage West Didsbury Storage 017 +1 more M33
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
Plot C Land at Severn Road Avonmouth BS10 7SE (7 components)
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
β€’ The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. The connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Storage (Duration 1h) Storage (Duration 2h) Voltalia UK Ltd New Build Generating CMU Severn Road Severn Road 5 +2 more BS10
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
27.31 MW
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (6 components) Geocoding Needed
β€’ A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
β€’ A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Storage Storage (Duration 2h) VATTENFALL WIND POWER LTD New Build Generating CMU Battery@Ray Battery@Ray +2 more
Active β€’ 2024-25 (T-4), 2024-25 (T-1) ...
11.94 MW
Southmoor Lane Havant Hampshire PO9 1JW (3 components)
β€’ New Build Generating CMU comprising of battery storage and associated plant.
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active β€’ 2026-27 (T-4), 2023-24 (T-4) ...
7.09 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
β€’ Battery Energy Storage System (2)
β€’ A gas fuelled generating station.
Active β€’ 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
WHITLEY GOLF COURSE CORSHAM ROAD, SHAW, MELKSHAM SN12 8EQ. (Nearest postcode to grid reference: SN12 8EH). (10 components)

Battery Storage Plant (3)

Storage Storage (Duration 2h) MELKSHAM EAST STORAGE LIMITED MELKSHAM WEST STORAGE LIMITED New Build Generating CMU Melksham East Storage Melksham East Storage 010 +4 more SN12
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 8 locations