Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

4 unique locations (27 components)

Land At Woolaston Road, Woolaston Road, Redditch, Worcestershire B98 7SG Redditch (7 components)
• Battery Storage Plant
• Heysham 1 Power Station CMU 2: [HY1223] T_HEYM12
• New reciprocating gensets in acoustic enclosure
Active • 2027-28 (T-4), 2025-26 (T-4) ...
6.52 MW
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (4 components)
• Chemical manufacturer
• New Build Battery Energy Storage system
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2022-23 (T-3) ...
15.50 MW
Southend University Hospital, Trust Prittlewell Chase, Southend-on-Sea, Westcliff on-Sea, SS0 0RY (12 components)
• A new build 19MW battery energy storage system
• CHP
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.45 MW
Toray 2 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (4 components)
• CMU consisting of multiple reciprocating engines and alternators
• Gas reciprocating engines.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
3.39 MW
Loading map...
Showing 4 locations