Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

3 unique locations (38 components)

Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (15 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• To be confirmed once CMU components are known
Active • 2025-26 (T-4), 2024-25 (T-4) ...
91.05 MW
Land off Mansfield Road, Little Morton Farm, Little Morton, Retford, DN22 8HE (17 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery energy storage unit
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.20 MW
The Power House Commercial Road Wolverhampton WV1 3QS (6 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• New build battery storage CMU with CMU ID 23AUC1
• To be confirmed once CMU components are known
Active • 2024-25 (T-1), 2022-23 (T-3) ...
10.75 MW
Loading map...
Showing 3 locations