Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2.5h)

6 unique locations (36 components)

Asda Chester, Greyhound Retail Park unit 33, Chester, CH1 4QQ (11 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
13.36 MW
Asda Redditch, Jinnah Road, Redditch, B98 7ER (11 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.08 MW
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Active • 2028-29 (T-4), 2024-25 (T-1) ...
0.14 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (3 components)
• Load drop
• New Build 2 hour battery storage system.
• New Build 2.5 hour battery storage system.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
15.20 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (4 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage).
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Active • 2028-29 (T-4), 2024-25 (T-1) ...
0.59 MW
St Philips energy storage facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (4 components)
• 99.000MW Battery Energy Storage site
• New Build CMU comprising of battery storage and associated plant
Active • 2028-29 (T-4), 2024-25 (T-1)
31.58 MW
Loading map...
Showing 6 locations