Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

334 unique locations (1426 components) - Page 9 of 14

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.

Storage Storage (Duration 1h) RNK Holding Ltd New Build Generating CMU Ipsley Battery Storage Facility Ipsley Battery Storage Facility Conditional B98
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
2.73 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR WELKIN MILL LIMITED New Build Generating CMU Welkin Mill 1 Welkin Mill 1 +5 more SK6
Active • 2025-26 (T-4), 2024-25 (T-4) ...
46.27 MW
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET (1 component)

Frequency response 60 minute Battery Storage

Storage (Duration 1h) ADD RENEWABLES NO.3 LIMITED New Build Generating CMU Hunn1 Conditional S70
Inactive • 2022-23 (T-4)
10.29 MW
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (4 components)

Battery storage 40.000MW/40.000MWh one duration battery new build

Storage (Duration 1h) CARE POWER (BARNSLEY) LIMITED New Build Generating CMU BARNB1 S70
Active • 2025-26 (T-4), 2024-25 (T-1) ...
17.60 MW
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (4 components)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building.
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; equipment, metering room, SCADA room and 33kV switching room.
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; equipment, metering room, SCADA room and 33kV switching room.
Storage (Duration 1h) DRUMCROSS ENERGY STORAGE LIMITED New Build Generating CMU Drumcross Drumcross Energy Storage EH48
Active • 2025-26 (T-4), 2022-23 (T-4) ...
16.36 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (11 components)
• 19.500 MW of battery storage located at Hereford.
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGLAR2 AGLAR2 +1 more HR1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.15 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (12 components)
• 20.000MW of battery storage located at Lascar Works
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ADSLS2 ADSLS2 +2 more BL9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
35.80 MW
Leafield Battery Site, Monks Lane, Corsham SN13 9PH (4 components)

electricity storage site comprising brand new batteries, inverters and associated connection plant

Active • 2026-27 (T-4), 2025-26 (T-4)
19.03 MW
Lebanon Farm, Lower Dunton Road, Dunton, Brentwood, RM14 3TD (1 component)

40MW/40MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU LEBANON FARM Not Prequalified RM14
Active • 2026-27 (T-4)
4.72 MW
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (2 components)

10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm.

Storage (Duration 1h) ENERGY DEMAND & RESPONSE LIMITED New Build Generating CMU Leighton Hall BESS Not Prequalified CW1
Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.05 MW
Levitt Hagg Landfill Site, Warmsworth, Doncaster, South Yorkshire, DN4 9RS (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Levitt Hagg Storage Levitt Hagg Storage Not Prequalified DN4
Active • 2025-26 (T-4)
2.00 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (6 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM EAST STORAGE LIMITED New Build Generating CMU Melksham East Storage1 Melksham East Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
36.80 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG. (6 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM WEST STORAGE LIMITED New Build Generating CMU Melksham West Storage1 Melksham West Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.03 MW
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (8 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD
• Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (2B) +1 more TS22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.02 MW
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Storage Storage (Duration 1h) BALANCE POWER PROJECTS LIMITED New Build Generating CMU LOWDY1 LOWDY1 Conditional CA11
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
5.20 MW
Lower Dunton Road, Upminster, RM14 3TD (1 component)

New battery storage project

Storage (Duration 1h) BASILDON BESS LIMITED New Build Generating CMU KILWINNING RM14
Active • 2025-26 (T-4)
4.79 MW
Maes Mawr Farm, Pound Farm Lane, Llantwit Fardre, Tonteg, CF38 1SU (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
9.06 MW
Maidenhead Road, Windsor, SL4 5GD (8 components)
• Battery Storage
• Battery storage
• Battery strorage unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.57 MW
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
• New build one-hour duration storage to replace diesel plant
• New build two-hour duration storage to replace diesel plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.97 MW
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (5 components)

The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 …

Storage Storage (Duration 1h) GHEB2 C1 Limited New Build Generating CMU Meadowcroft Farm Meadowcroft Farm +1 more Not Prequalified GL54
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.19 MW
Middleton Road, Middleton, Lancashire, Near LA3 2SD (1 component)

49.900 Storage unit

Storage (Duration 1h) LANCASTER POWER LIMITED New Build Generating CMU Not Prequalified LA3
Active • 2024-25 (T-4)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (4 components)

7 MW of Battery Storage located at Grantham. (3)

Storage Storage (Duration 1h) Limejump Virtual 1 Limited Existing Generating CMU Mill Farm MillFarm1 +2 more NG32
Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Mill Farm, Caythorpe, Heath Ln, Grantham, NG32 3ER (13 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.33 MW
Millstream, Maidenhead Road, Windsor, SL45GD (2 components)

Battery storage unit (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
Loading map...
Showing 25 locations