Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

94 unique locations (304 components) - Page 2 of 4

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Hulley Road, Macclesfield, Cheshire, SK10 2LP (1 component) Geocoding Needed

20.000 MW of battery storage located at Macclesfield

Inactive • 2022-23 (T-4)
5.88 MW
Indian Queens Substation, St Dennis, St Austell, PL26 8BY (1 component) Geocoding Needed

49.9 MW of Lithium Ion battery storage and power conversion system on a compound at Indian Queens Substation.

Storage (Duration 1h) IQ ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified PL26
Inactive • 2023-24 (T-4)
10.20 MW
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility), Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (4 components) Geocoding Needed

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
12.11 MW
J3 Business Park Balby Carr End Doncaster DN4 8DE (2 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Storage Storage (Duration 1h) Limejump Virtual 5 Limited New Build Generating CMU Doncaster Balby Doncaster Balby DN4
Inactive • 2019-20 (T-1), 2018-19 (T-1)
J3 Business Park, Balby, Carr End, Doncaster, DN4 8DE (3 components) Geocoding Needed
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
7.26 MW
Johnson Street, Leigh, M46 0RB (4 components) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 1h) AVE 017 Limited New Build Generating CMU Johnson Street A Johnson Street B Not Prequalified M46
Inactive • 2023-24 (T-4), 2022-23 (T-3)
6.27 MW
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (5 components) Geocoding Needed
• 49.900MW Battery Energy Storage System
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire
Storage (Duration 1h) LOWER MINETY ENERGY LIMITED New Build Generating CMU LMES01 LMES01 SN16
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
36.60 MW
Land adjacent to electricity sub station Stonehill Charlton, Malmsbury, Wiltshire SN16 9DX (1 component) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage (Duration 1h) Lower Minety Energy Limited New Build Generating CMU Lower Minety Storage Conditional SN16
Inactive • 2022-23 (T-4)
14.67 MW
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Storage (Duration 1h) MINETY BATTERY STORAGE LIMITED New Build Generating CMU Minety Storage Minety Storage Conditional SN16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
24.46 MW
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (5 components) Geocoding Needed
• Battery Energy Storage System located at Minety
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services.
Storage (Duration 1h) MINETY BATTERY STORAGE LIMITED New Build Generating CMU MBSS01 MBSS01 SN16
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
37.16 MW
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components) Geocoding Needed

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Storage Storage (Duration 1h) SIGBAT A LIMITED New Build Generating CMU UKER28 UKER28 +2 more CH65
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
34.18 MW
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Storage (Duration 1h) HILLHOUSE BATTERY STORAGE LIMITED New Build Generating CMU Hillhouse Storage Hillhouse Storage Conditional FY5
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
24.46 MW
Land Adj To Electricity Sub Station Hillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (2 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage (Duration 1h) HILLHOUSE BATTERY STORAGE LIMITED New Build Generating CMU Hillhouse Storage Hillhouse Storage Rejected FY5
Inactive • 2023-24 (T-4), 2022-23 (T-3)
20.85 MW
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (3 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Storage (Duration 1h) WEST MELTON BATTERY STORAGE LIMITED New Build Generating CMU West Melton Storage West Melton Storage Conditional S63
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
24.46 MW
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (9 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Storage (Duration 1h) FISHCROSS BATTERY STORAGE LIMITED New Build Generating CMU Bankhead Storage Bankhead Storage +3 more Conditional FK10
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
34.25 MW
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (1 component)

A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring …

Storage (Duration 1h) ENERGY STORE 6 LTD New Build Generating CMU York Energy Centre Conditional YO61
Inactive • 2019-20 (T-1)
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (3 components) Geocoding Needed
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
15.88 MW
Land at Burnley Road Simonstone BB12 7ND (4 components) Geocoding Needed

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Storage (Duration 1h) SIGBAT B LIMITED New Build Generating CMU UKER30 UKER76 +2 more Rejected BB12
Inactive • 2019-20 (T-1)
13.68 MW
Land at Claredown Farm, Hickford Hill, Belchamp St Paul, Sudbury, Essex, CO10 7DW (6 components) Geocoding Needed
• 20 MW of DSR
• 20MW Battery Storage Facility located in Sudbury, Essex.
• 3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
42.65 MW
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (5 components) Geocoding Needed
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW.
Storage Storage (Duration 1h) RNA-Energy Ltd New Build Generating CMU Tollgate Battery Storage Facility Tollgate Battery Storage Facility +1 more Conditional AL4
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
44.12 MW
Land at Traston Road, Newport NP19 4PW (1 component) Geocoding Needed

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …

Storage (Duration 1h) FPC INDUSTRY & ENTERPRISE 2 LIMITED New Build Generating CMU Traston Road Conditional NP19
Inactive • 2022-23 (T-4)
5.80 MW
Land in the vicinity of Feeder Road, to the east of Phillip Street, Bristol BS2 0TB, UK (1 component) Geocoding Needed

The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Storage (Duration 1h) Aura Power Storage Solutions Ltd New Build Generating CMU Feeder Road Battery Storage Facility Conditional BS2
Inactive • 2022-23 (T-4)
5.88 MW
Land North of Oxford Road, Gerrards Cross, SL9 8DT (2 components) Geocoding Needed

20MW of Lithium Ion batteries and power conversion system installed on a compound on land north Oxford Road

Storage (Duration 1h) PINSTONE ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified SL9
Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.18 MW
Land off Carseview Road, Forfar, DD8 3BS (7 components) Geocoding Needed
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
• Battery storage and associated infrastructure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
20.96 MW
Land off Tower House Lane, Saltend, Hull, UK, HU12 8EE (2 components) Geocoding Needed

The CMU component at the Saltend Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Storage Storage (Duration 1h) NORTH EAST GRID STORAGE ONE LTD New Build Generating CMU Saltend Battery Storage Facility Saltend Battery Storage Facility Conditional HU12
Inactive • 2022-23 (T-4), 2021-22 (T-4)
13.17 MW
Loading map...
Showing 25 locations