Storage (Duration 1h)

317 unique locations (1239 components) - Page 11 of 13

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Potman's Lane, Battle, TN33 9BL (5 components)
• A Battery Energy Storage System (2)
• A Battery Energy Storage System, which has already PQ'd as POTM25
Storage (Duration 1h) Storage (Duration 1.5h) BRK 002 LIMITED BRK 002 LIMITED New Build Generating CMU Potmans Lane Potmans Lane +3 more TN33
Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.67 MW
Potmans Lane, Battle, TN33 9BL (6 components)

A Battery Energy Storage System (2)

Storage (Duration 1h) BRK 002 Limited New Build Generating CMU Potmans Lane A Potmans Lane B +1 more Not Prequalified TN33
Inactive • 2023-24 (T-4), 2022-23 (T-3)
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
• 0.500MW Battery Energy Storage System (2)
• 0.5MW of demand reduction
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT002 NG2
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Redcoat Lane, Kirkstall, LS4 2AL (1 component)

100MW storage unit

Storage (Duration 1h) EUNITY SUPPORT SERVICES LTD New Build Generating CMU Not Prequalified LS4
Active • 2024-25 (T-4)
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Gas reciprocating engines as the generating unit. (2)
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.21 MW
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Storage (Duration 1h) HC ESS4 LIMITED New Build Generating CMU Longridge 3 Longridge 3 +1 more PR2
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Richborough Energy Park Ramsgate road Sandwich CT13 9NL (3 components)
• 49.990 MW battery energy storage system
• Battery Energy Storage System
• battery energy storage system
Storage (Duration 1h) RICHBOROUGH ENERGY PARK LIMITED Existing Generating CMU PGREP2 PGREP2 CT13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
20.03 MW
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (3 components)
• 49.990 MW battery energy storage system at Richborough Energy Park
• Battery Energy Storage System
• Battery energy storage system at Richborough Energy Park
Storage (Duration 1h) RICHBOROUGH ENERGY PARK LIMITED Existing Generating CMU PGREP1 PGREP1 CT13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
20.03 MW
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (2 components)
• 35.000MW battery energy storage system
• 35.000MW battery energy storage system.
Active • 2026-27 (T-4)
8.27 MW
Rotherham Landfill Site, Meadowhall Road, Kimberworth, Rotherham, South Yorkshire, S61 2JN (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Rotherham Storage Rotherham Storage Not Prequalified S61
Active • 2025-26 (T-4)
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (3)

Storage (Duration 1h) FLEXITRICITY LIMITED Existing Generating CMU FLEX158 EX31
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.38 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 003 LIMITED New Build Generating CMU Royle Barn Road Royle Barn Road +3 more Not Prequalified OL11
Active • 2026-27 (T-4), 2025-26 (T-1) ...
28.13 MW
Royle Farm Burton upon Trent Derbyshire DE15 9TU (1 component)

A 90 MW battery storage system comprising approx 11 battery skid units units at Royle Farm Business Park

Storage (Duration 1h) ALUDRA BESS LTD New Build Generating CMU DrakelowBS52 Not Prequalified DE15
Active • 2025-26 (T-4)
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Storage Storage (Duration 1h) GHEB2 C2 Limited CONRAD (WINCHESTER) LIMITED New Build Generating CMU Russell Farm Russell Farm +3 more SO21
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Safran Landing Systems Services UK Ltd, Safran MRO UK, METEOR BUSINESS PARK, CHELTENHAM ROAD EAST, GLOUCESTER, GLOUCESTERSHIRE, GL2 9QL (4 components)

1.500MW Battery Energy Storage System (3)

Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT001 GL2
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Scotia Road Business Park, Tunstall, Stoke on Trent, ST6 4HG (1 component)

The CMU component will have a connection capacity of 2.5MW. BYD Battery

Storage (Duration 1h) THE ISLE OF WIGHT ENERGY COMPANY LIMITED New Build Generating CMU Not Prequalified ST6
Active • 2026-27 (T-4)
0.30 MW
SEC, Stobcross Road, Scottish Event Campus, Stobcross, Glasgow, G3 8DG (2 components)

60MW / 60MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU SEC 1 SEC 2 Not Prequalified G3
Active • 2026-27 (T-4)
14.17 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (9 components)
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken. (2)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Storage (Duration 1h) Storage (Duration 1.5h) THRIVE RENEWABLES (WICKEN) LIMITED Existing Generating CMU Wicken Wicken +3 more Rejected MK19
Active • 2026-27 (T-4), 2024-25 (T-1) ...
2.01 MW
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components)

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; … (2)

Storage (Duration 1h) ERSKINE ENERGY STORAGE LIMITED New Build Generating CMU Erskine Erskine Energy Storage Rejected PA7
Active • 2025-26 (T-4), 2022-23 (T-4)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (5 components)

5MW, 1 hour/5MWh lithium-ion battery (3)

Storage Storage (Duration 1h) BRAINTREE ELECTRIC FORECOURT LTD New Build Generating CMU Braintree Electric Forecourt Braintree Electric Forecourt +2 more CM77
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.93 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (3 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Storage Storage (Duration 1h) BRAINTREE ELECTRIC FORECOURT LTD New Build Generating CMU Braintree Electric Forecourt Slamseys Energy Centre +1 more CM77
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Snarlton Farm Battery Snarlton Lane Melksham SN12 7QP (1 component)

47.000MW standalone battery energy storage project

Active • 2024-25 (T-1)
5.33 MW
Snarlton Farm Battery Snarlton Lane Melksham SN12 7QP (1 component)

30.000MW standalone battery energy storage project

Active • 2026-27 (T-4)
3.54 MW
SNARLTON LANE, SNARLTON LANE, MELKSHAM, SN12 7QP (1 component)

1 hour Lithium-ion battery storage facility in Melksham, Wiltshire going to be connected to Sandridge 132/33 kV substation with a connection capacity of 49.9MW

Active • 2025-26 (T-1)
5.98 MW
Spitfire Way, Wholeflats, Grangemouth FK3 9UB Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (3 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (3)

Storage Storage (Duration 1h) SpectrumReserve6 Ltd. New Build Generating CMU Spitfire Way Battery Storage Facility Spitfire Way Battery Storage Facility Not Prequalified FK3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations