Storage (Duration 1h)

1 unique locations (6 components)

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Storage Storage (Duration 1h) Storage (Duration 0.5h) VATTENFALL WIND POWER LTD Existing Generating CMU Battery@PyC Battery@PyC +1 more Rejected CF42
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Loading map...
Showing 1 locations