Storage (Duration 1h)

3 unique locations (41 components)

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Storage Storage (Duration 1h) SIGBAT D LIMITED New Build Generating CMU UKER31 UKER33 +2 more Not Prequalified WN1
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Storage Storage (Duration 1h) SIGBAT A LIMITED New Build Generating CMU UKER28 UKER28 +2 more CH65
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (29 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel) UK POWER RESERVE LIMITED Existing Generating CMU Asfordby 1 Power Station Asfordby 1 Power Station +12 more LE14
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 3 locations