Storage (Duration 1h)

7 unique locations (149 components)

EDF Energy, Dungeness B power station, Romney Marsh, Kent, TN29 9PX (41 components)
• Dungeness B Power Station CMU 21: [DN2124] T_DNGB21 + (50% x T_DNGB-D)
• Dungeness B Power Station CMU 22: [DN2223] T_DNGB22 + (50% x T_DNGB-D)
• Dungeness B Power Station CMU 22: [DN2224] T_DNGB22 + (50% x T_DNGB-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1489.08 MW
EDF Energy, Hunterston B power station, West Kilbride, Ayrshire, KA23 9QX (40 components)
• Existing CCGT Unit
• Hunterston B Power Station CMU 7: [HU7-21] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Hunterston B Power Station CMU 8: [HU8-21] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1607.21 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (5 components)
• 1.200MW of battery storage located at Hook.
• Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Unproven DSR yet to be procured
Active • 2028-29 (T-4), 2020-21 (T-4) ...
0.11 MW
Little Barford Power Station Little Barford St Neots PE19 6YT (32 components)
• 49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.
• Little Barford 1 CCGT MSID: 4052
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3881.97 MW
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (4 components)
• 49.990 MW battery energy storage system at Richborough Energy Park
• Battery Energy Storage System
• N/A
Active • 2025-26 (T-1), 2023-24 (T-1) ...
15.37 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (17 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2026-27 (T-4), 2025-26 (T-1) ...
52.07 MW
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (10 components)
• A 50MW New Build Battery Storage site
• CMU Component is 500kVA reciprocating diesel engine.
• Existing 50MW Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Loading map...
Showing 7 locations