Storage (Duration 1h)

10 unique locations (172 components)

Dairy Lane Westhamnett Chichester PO20 2BG (2 components)
• 4MW battery co-located with a solar farm
• Aggregate CMU from multiple sources
Active • 2028-29 (T-4), 2022-23 (T-4)
0.42 MW
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (47 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.26 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (10 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31.39 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG. (12 components)
• A gas engine CHP site providing hot water to a local district heating network
• Battery Storage Plant
• Flour & semolina milling business
Active • 2025-26 (T-4), 2024-25 (T-1) ...
59.60 MW
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (25 components)
• Refurbishment Unit 4 Cruachan pump storage hydro plant
• Unit 1 Cruachan pumped storage hydro plant
• Unit 2 Cruachan pumped storage hydro plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
827.61 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
14.72 MW
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)
• Aggregate CMU from Multiple Sources
• Front of the Meter battery storage asset located in Devon.
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
0.79 MW
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (9 components)
• A Battery Energy Storage System
• Aggregate CMU from multiple sources
• Single Shaft CCGT (Module 2)
Active • 2028-29 (T-4), 2025-26 (T-4) ...
580.82 MW
Sellindge Convertor Station, Church Lane, Sellindge, Ashford, TN25 6AF (21 components)
• Interconnexion France Angleterre (IFA) 2,000MW high voltage direct current link between the French and GB transmission systems.
• Interconnexion France Angleterre (IFA) 1988MW (TEC) high voltage direct current link between the French and GB transmission systems.
• Newbuild gas generator
Active • 2028-29 (T-4), 2027-28 (T-4) ...
826.58 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.70 MW