5 unique locations (118 components)

Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (20 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
66.68 MW
Thurscoe Business Park, Barrowfield Rd, Thurscoe, Rotherham S63 0DB (4 components)
• 5MW of Lithium Ion battery storage and power conversion systems.
• Gas reciprocating engines
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (13 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• New Battery Storage Site comprising brand new batteries & inverters
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
10.68 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (8 components)
• 1 x hydro turbine & synchronous generator
• Solar PV generation site
• The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.09 MW