Storage (Duration 1h)

2 unique locations (6 components)

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (4 components) Geocoding Needed
β€’ Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building.
β€’ Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; equipment, metering room, SCADA room and 33kV switching room.
β€’ Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; equipment, metering room, SCADA room and 33kV switching room.
Storage (Duration 1h) DRUMCROSS ENERGY STORAGE LIMITED New Build Generating CMU Drumcross Drumcross Energy Storage EH48
Active β€’ 2025-26 (T-4), 2022-23 (T-4) ...
16.36 MW
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components) Geocoding Needed

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; …

Active β€’ 2025-26 (T-4), 2022-23 (T-4)
14.76 MW
Loading map...
Showing 2 locations