Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

2 unique locations (7 components)

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Plot B at Severn Road Avonmouth BS10 7SE (3 components)
• 15.000MW of Battery Energy Storage Systems
• 15MW of Battery Energy Storage Systems
• The CMU will be formed of multiple individual Batteries. This site is to include a 17MW Battery Energy Storage System (BESS) that can either operate as import or export at will. The 17MW connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Plot B at Severn Road Avonmouth BS10 7SE (4 components)
• 15.000MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
• New Build Battery Energy Storage Systems
Storage (Duration 1h) Hallen Energy Ltd Existing Generating CMU New Build Generating CMU NB_308 NB_308 BS10
Active • 2025-26 (T-1), 2024-25 (T-1) ...
2.50 MW
Loading map...
Showing 2 locations