Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (66 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Windsor Battery West, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (9 components)
• Battery Storage
• Chemical manufacturer
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.05 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2027-28 (T-4), 2024-25 (T-4) ...
255.05 MW
Thurscoe Business Park, Barrowfield Rd, Thurscoe, Rotherham S63 0DB (4 components)
• 5MW of Lithium Ion battery storage and power conversion systems.
• Gas reciprocating engines
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (12 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• The CMU Component reduces import demand by turning on back up generation.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.39 MW
RPC Containers Ltd, Schofield Rd, Oakham LE15 6RW United Kingdom (5 components)
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• CHP Unit
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.22 MW
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (9 components)
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
• Component has yet to be procured.
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
10.01 MW
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (19 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• EV charging at residential premises
Active • 2026-27 (T-4), 2025-26 (T-1) ...
76.74 MW
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (10 components)
• Battery storage plant
• Component has yet to be procured.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 35MW of power, although it is currently constrained by a grid connection of 31.43MW (at export meter point). Located in Glass Avenue, Cardiff.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
36.31 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
• Pembroke 51 - CCGT MSID: 7237
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6359.67 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (7 components)
• A 40MW New Build Battery Storage site
• A 45MWh New Build Battery Storage site
• Component has yet to be procured.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
22.08 MW
New River Head TWRM Shaft & WBS, Amwell Street, Finsbury, London, United Kingdom, EC1R 1XU (4 components)
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.09 MW
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (13 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• New Battery Storage Site comprising brand new batteries & inverters
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
10.68 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (13 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• EnerG 1000 CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
244.31 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT). (9 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery Storage Plant
• Single Shaft CCGT (Module 2)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2025-26 (T-1), 2024-25 (T-4) ...
19.79 MW
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (5 components)
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales.
• Component has yet to be procured.
• Load reduction upon instruction
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Great Field Lane, Somerden Road, Hull, HU9 5QJ (2 components)
• New build one-hour duration storage to replace diesel plant
• gas-fired CHP unit
Active • 2025-26 (T-4), 2022-23 (T-3)
2.99 MW
Grafham INTAKE WA, GRAFHAM INTAKE (OFFORD) WA S2, Offord, HUNTINGDON Cambridgeshire, PE19 5RG, (8 components)
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2026-27 (T-4), 2020-21 (T-4) ...
1.72 MW
Glyn Rhonwy Pumped Storage Facility, Ffordd Clegir, Caernarfon, Gwynedd LL55 4EL Note: The site is currently brown field with no ability to receive post. As such this address uses the nearest current postcode. (13 components)
• 49.999 MW pumped storage facility in Gwynedd, North Wales.
• A new Build Generating Storage CMU
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
284.81 MW
Friar's Pride Oxney Rd, Peterborough, PE1 5YW, United Kingdom (4 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
EDF Energy, Hunterston B power station, West Kilbride, Ayrshire, KA23 9QX (40 components)
• Existing CCGT Unit
• Hunterston B Power Station CMU 7: [HU7-21] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Hunterston B Power Station CMU 8: [HU8-21] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1607.21 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (20 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.89 MW
Loading map...
Showing 25 locations