Storage (Duration 1h)

1 unique locations (6 components)

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (6 components)
β€’ Grid scale energy storage system based on Lithium Ion tech, capable of exporting the declared capacity for the stated duration
β€’ Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Westhoughton
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton0077 Bolton0078 +3 more Not Prequalified BL5
Active β€’ 2029-30 (T-4), 2027-28 (T-4) ...
18.41 MW
Loading map...
Showing 1 locations