Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

4 unique locations (35 components)

Boscar Grange Farm York YO61 3NQ (4 components)

Battery Energy Storage system operating alongside solar farm

Active • 2025-26 (T-1), 2023-24 (T-1) ...
6.19 MW
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (2 components)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt

Active • 2025-26 (T-1), 2023-24 (T-1)
1.93 MW
Inverawe Power Station, Inverawe, by Taynuilt, Argyll, PA35 1HU (24 components)
• 1 x hydro turbine & synchronous generator
• 1x hydro turbine & synchronous generator
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
91.46 MW
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (5 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt

Active • 2026-27 (T-4), 2025-26 (T-1) ...
3.28 MW
Loading map...
Showing 4 locations