Storage (Duration 1h)

1 unique locations (8 components)

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Back Lane, Chesterfield, S44 5XQ (8 components)
β€’ A Battery Energy Storage System. (2)
β€’ 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
Storage (Duration 1h) ARL 027 LIMITED ARL 027 LIMITED New Build Generating CMU Back Lane Back Lane +2 more S44
Active β€’ 2024-25 (T-4), 2023-24 (T-1) ...
3.72 MW