43 unique locations (355 components) - Page 1 of 2

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components) Geocoding Needed
β€’ 3 x 2MW gas gen sets
β€’ Battery Storage Station
Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Union Road Storage Union Road Storage +2 more BL2
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
10.03 MW
Thrybergh Weir, Kilnhurt, Mexborough, South Yorkshire, S64 5TJ (3 components) Geocoding Needed

1.200MW BESS

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
0.45 MW
The Manorway, Stanford-le-Hope, SS17 9LL (3 components) Geocoding Needed
β€’ A Battery Energy Storage System
β€’ Reciprocating engines of 6 mW.
Storage (Duration 1h) Storage (Duration 2h) CORPOWER LIMITED CORRINGHAM POWER LIMITED New Build Generating CMU Corpower Battery Corringham SS17
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (11 components) Geocoding Needed
β€’ 20.000 MW of battery storage located at Macclesfield.
β€’ 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
β€’ Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGHUL2 AGHUL2 +2 more SK10
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
33.21 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (11 components) Geocoding Needed
β€’ 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
β€’ 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
β€’ 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
DSR Storage (Duration 1h) SUSI EELPOWER WINCHESTER LIMITED Existing Generating CMU WINP18 WINP18 +7 more SO22
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
42.53 MW
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components) Geocoding Needed

Front of the Meter battery storage asset located in Devon.

Storage (Duration 1h) FLEXITRICITY LIMITED Existing Generating CMU FLEX158 EX31
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
1.38 MW
Richborough Energy Park, Ramsgate Road, Sandwich, CT13 9NL (6 components) Geocoding Needed
β€’ 35.000MW battery energy storage system
β€’ 35.000MW battery energy storage system.
β€’ Battery Energy Storage
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
33.08 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components) Geocoding Needed
β€’ Battery Storage Station
β€’ Gas reciprocating engines as the generating unit.
β€’ Open cycle gas turbine as the generating unit.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
174.30 MW
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components) Geocoding Needed
β€’ This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
β€’ This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active β€’ 2027-28 (T-4), 2025-26 (T-1) ...
4.51 MW
Mill Farm, Caythorpe, Heath Ln, Grantham, NG32 3ER (13 components) Geocoding Needed
β€’ 7 MW of Battery Storage loacated at Grantham.
β€’ 7 MW of Battery Storage located at Grantham.
β€’ Battery Storage located at Grantham.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
11.33 MW
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components) Geocoding Needed
β€’ New build one-hour duration storage to replace diesel plant
β€’ New build two-hour duration storage to replace diesel plant
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
9.97 MW
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (8 components) Geocoding Needed
β€’ 1.200MW of battery storage located at Durham.
β€’ 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD
β€’ Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (2B) +1 more TS22
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
6.02 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (12 components) Geocoding Needed
β€’ 20.000MW of battery storage located at Lascar Works
β€’ 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
β€’ Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ADSLS2 ADSLS2 +2 more BL9
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
35.80 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (11 components) Geocoding Needed
β€’ 19.500 MW of battery storage located at Hereford.
β€’ 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
β€’ Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGLAR2 AGLAR2 +1 more HR1
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
25.15 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (13 components) Geocoding Needed
β€’ 17.315 MW installed capacity Battery Storage facility
β€’ 17.615 MW installed capacity Battery Storage facility
β€’ 19.791 MW installed capacity Battery Storage facility
DSR Storage (Duration 1h) SUSI EELPOWER ROCK FARM LIMITED Existing Generating CMU ROCK18 ROCK18 +7 more SY8
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
96.46 MW
Land To The South Of Kemsley Substation, Ypres Drive, Sittingbourne, Kent, ME10 2FB (9 components) Geocoding Needed
β€’ The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
β€’ The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
50.26 MW
Land off Stoke Lane, Norwich, NR14 8QD (3 components) Geocoding Needed
β€’ Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated land within a compound at Wood Farm
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Norwich A Norwich B +1 more Not Prequalified NR14
Active β€’ 2027-28 (T-4), 2025-26 (T-4)
30.73 MW
Land North of Clayhill Farm, Westoning, MK45 5JD (11 components) Geocoding Needed
β€’ 6 MW Battery Storage facility located at Westoning.
β€’ 6.000MW of battery storage located at Westoning.
β€’ 6.000MW of storage located at Westoning
DSR Storage Storage (Duration 1h) CLAYHILL SOLAR LIMITED Existing Generating CMU Clayhill MK45
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
14.24 MW
Land North of Clayhill Farm, Westoning MK45 5JD (5 components) Geocoding Needed
β€’ 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
β€’ Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (2B) +1 more MK45
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
1.23 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application), Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components) Geocoding Needed
β€’ The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
β€’ The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
β€’ The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
18.71 MW
Land at Sterte Avenue West, Poole, BH15 2AL (12 components) Geocoding Needed
β€’ A 7.5MW Tesla Battery Energy Storage System
β€’ A 7MW Battery Energy Storage System
β€’ Tesla Battery Energy Storage System
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY HB LIMITED Existing Generating CMU HOLES BAY HOLESBAY +4 more BH15
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
18.69 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components) Geocoding Needed
β€’ Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Westhoughton
β€’ Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton0077 Bolton0078 +3 more Not Prequalified BL5
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
20.00 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (7 components) Geocoding Needed

CMU comprising of battery storage and associated plant

Storage (Duration 1h) CONRAD (FLITWICK) LIMITED Existing Generating CMU Flitwick Flitwick +3 more MK45
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
30.94 MW
Knottingley Hydropower Station, Brotherton Weir, Knottingley, West Yorkshire, WF11 8HR (3 components) Geocoding Needed

1.200 MW battery storage

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
0.45 MW