Storage (Duration 1h)

69 unique locations (782 components) - Page 1 of 3

Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (20 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
55.97 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (16 components)
• Battery storage plant
• Existing generating battery storage unit.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
50.58 MW
Barton Hill Way, Torquay, TQ2 8JG (10 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
41.28 MW
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated land within a compound at Belvedere Nurseries
Active • 2025-26 (T-4)
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (16 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
10.35 MW
Capenhurst Lane Cheshire CH66 2NT (1 component)

A 99.8MW battery storage system comprising approx 13 skids, to be installed at Capenhurst Lane

Active • 2025-26 (T-4)
19.92 MW
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (16 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.27 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (18 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
91.05 MW
Coity Road, Bridgend, CF31 1NN (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
2.10 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (14 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
34.61 MW
Dairy Lane Westhamnett Chichester PO20 2BG (8 components)

4MW battery co-located with a solar farm

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.51 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (125 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5209.30 MW
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.67 MW
Feddal Battery Storage System, Feddal Estate, Dunblane, FK15 9RD (3 components)

9.999MW/9.999MWh greenfield BESS located approximately 3km West of Braco village, Dunblane, Scotland

Active • 2025-26 (T-4)
5.99 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (7 components)
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2025-26 (T-4)
1.70 MW
Gerard Hall Battery Site, Mill Lane, Nursling SO16 0YE (3 components)

New Battery Storage Site comprising brand new batteries & inverters

Active • 2025-26 (T-4)
18.91 MW
Goosehall Farm, Factory Road, Burwell, CB25 0BN (5 components)

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system …

Active • 2025-26 (T-4), 2022-23 (T-1)
Great Field Lane, Somerden Road, Hull, HU9 5QJ (1 component)

New build one-hour duration storage to replace diesel plant

Active • 2025-26 (T-4)
2.99 MW
Hamble Lane, Old Netley, Southampton, SO31 5FT (2 components)

A Battery Energy Storage System

Active • 2025-26 (T-4)
2.84 MW
Heatherywood Road, Kirkcaldy KY1 3NW (5 components)

1hr duration battery storage project.

Active • 2025-26 (T-4), 2022-23 (T-1)
4.14 MW
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (4 components)

New build one-hour duration storage to replace diesel plant

Active • 2025-26 (T-4), 2023-24 (T-1)
8.00 MW
66.82 MW
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
41.79 MW
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (13 components)

10MW of Battery Energy Storage Systems to be built.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
21.12 MW
Loading map...