Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

8 unique locations (298 components)

Rotherham Landfill Site, Meadowhall Road, Kimberworth, Rotherham, South Yorkshire, S61 2JN (2 components)
โ€ข Battery Storage Station
โ€ข Connah's Quay PS Unit 1 CCGT
Active โ€ข 2025-26 (T-4), 2022-23 (T-3)
2.99 MW
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (17 components)
โ€ข 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
โ€ข A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active โ€ข 2027-28 (T-4), 2025-26 (T-4) ...
14.85 MW
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
โ€ข Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
โ€ข OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
โ€ข OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (55 components)
โ€ข Pembroke 21 - CCGT MSID: 7237
โ€ข Pembroke 41 - CCGT MSID: 7237
โ€ข Pembroke 51 - CCGT MSID: 7237
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
6359.67 MW
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (18 components)
โ€ข Battery Storage Plant
โ€ข Small gas fired OCGT.
โ€ข The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
98.37 MW
EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU (34 components)
โ€ข Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
โ€ข Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
โ€ข Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
3068.68 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
โ€ข BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
โ€ข BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
โ€ข BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane ,ย Wolverhampton, WV10 9QD (30 components)
โ€ข Gas fired reciprocating engines.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
43.30 MW
Loading map...
Showing 8 locations