Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

52 unique locations (274 components) - Page 1 of 3

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
19 Howard Road, Park Farm Industrial Estate, Redditch, Worcestershire, B98 7SE (2 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity … (2)

Storage (Duration 1h) RNK Holding Ltd New Build Generating CMU Ipsley Battery Storage Facility Not Prequalified B98
Inactive • 2023-24 (T-4), 2022-23 (T-3)
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (6 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (3)

Storage Storage (Duration 1h) GHEB2 A1 Limited New Build Generating CMU Pikelaw Place Pikelaw Place +2 more Not Prequalified WN8
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Albion Road, Dartford, Kent, UK, DA1 5PZ (6 components)
• A 2.5MW New Build Battery Storage System (2)
• A New Build 2.5MW Generation Battery Site
Storage (Duration 1h) HC ESS2 LIMITED New Build Generating CMU Littlebrook C Littlebrook C Not Prequalified DA1
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (4 components)
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour (2)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
Storage (Duration 1h) SCOTTISHPOWER RENEWABLES (UK) LIMITED New Build Generating CMU Whitelee Battery Whitelee Battery +1 more G75
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Back Lane, Chesterfield, S44 5XQ (8 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
Storage (Duration 1h) ARL 027 LIMITED ARL 027 LIMITED New Build Generating CMU Back Lane Back Lane +2 more S44
Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.72 MW
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)

Battery Energy Storage System (3)

Storage (Duration 1h) LIMEJUMP LTD New Build Generating CMU KPB004 Not Prequalified TA4
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Battery Storage, Keel Drive, Slough, SL1 2YA (4 components)
• A 20MW New Build Battery Storage site (2)
• A 29.5MW New Build Battery Storage site
Storage (Duration 1h) EQUINOR BLANDFORD ROAD LIMITED New Build Generating CMU Keel Drive 1 Keel Drive 1 Not Prequalified SL1
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Bolney Substation, Wineham Lane, Bolney, Haywards Heath, BN5 9AW (1 component)

49.9mw Lithium Ion batteries and power conversion system on a compound at Bolney Substation

Storage (Duration 1h) IQ ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified BN5
Inactive • 2023-24 (T-4)
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Storage Storage (Duration 1h) GHEB2 B1 LIMITED New Build Generating CMU Breach Farm Breach Farm +3 more DE12
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Brinksway, Stockport, SK3 0BY (2 components)

A Battery Energy Storage System (2)

Storage (Duration 1h) AVE 011 Limited New Build Generating CMU Brinksway Not Prequalified SK3
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Storage Storage (Duration 1h) GHEB2 C3 Limited CONRAD (SWINDON) LIMITED New Build Generating CMU Catsbrain Farm Catsbrain Farm +3 more SN3
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Chickerell substation, Weymouth, Dorset, DT4 9WW (1 component)

49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.

Storage (Duration 1h) IQ ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified DT4
Inactive • 2023-24 (T-4)
Crossways, Greenhithe, DA9 9BB (3 components)
• A Battery Energy Storage System. (2)
• 7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways
Storage (Duration 1h) ARL 002 Limited New Build Generating CMU Cotton Lane Not Prequalified DA9
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System
Storage (Duration 1h) ARL 001 Limited New Build Generating CMU Gipsy Lane A Not Prequalified OL11
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Storage (Duration 1h) ARL O09 Limited New Build Generating CMU Greenfield Road A Greenfield Road B Not Prequalified MK45
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (12 components)
• A new Build Generating Storage CMU (2)
• Existing Generating Storage CMU
Storage (Duration 1h) GH ESS7 LIMITED New Build Generating CMU Thurcroft 1 Thurcroft 1 +4 more Not Prequalified S66
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Indian Queens Substation, St Dennis, St Austell, PL26 8BY (1 component)

49.9 MW of Lithium Ion battery storage and power conversion system on a compound at Indian Queens Substation.

Storage (Duration 1h) IQ ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified PL26
Inactive • 2023-24 (T-4)
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (3 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)

Storage Storage (Duration 1h) Zenobe Wishaw Limited New Build Generating CMU Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Not Prequalified KY11
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Johnson Street, Leigh, M46 0RB (4 components)

A Battery Energy Storage System (2)

Storage (Duration 1h) AVE 017 Limited New Build Generating CMU Johnson Street A Johnson Street B Not Prequalified M46
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (5 components)
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire (2)
• 49.900MW Battery Energy Storage System
Storage (Duration 1h) LOWER MINETY ENERGY LIMITED New Build Generating CMU LMES01 LMES01 SN16
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (5 components)
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services. (2)
• Battery Energy Storage System located at Minety
Storage (Duration 1h) MINETY BATTERY STORAGE LIMITED New Build Generating CMU MBSS01 MBSS01 SN16
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (3 components)
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection (2)
• battery storage unit
Storage (Duration 1h) NURSLING ENERGY TWO LIMITED Existing Generating CMU Nurse2 Nursling SO16
Active • 2028-29 (T-4), 2023-24 (T-4) ...
0.63 MW
Land Adj To Electricity Sub Station Hillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (2 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (2)

Storage (Duration 1h) HILLHOUSE BATTERY STORAGE LIMITED New Build Generating CMU Hillhouse Storage Hillhouse Storage Rejected FY5
Inactive • 2023-24 (T-4), 2022-23 (T-3)
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (7 components)

Gas Peaking Reciprocating Engine (3)

Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines Dollymans Power Limited New Build Generating CMU Dollymans Power 016 Dollymans Power 039 +3 more SS11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (7 components)
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales. (2)
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
Solar Photovoltaic Storage (Duration 1h) PORTH WEN SOLAR LIMITED New Build Generating CMU North Anglesey Battery Storage Project North Anglesey Battery Storage Project +5 more Not Prequalified LL66
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations