Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

42 unique locations (187 components) - Page 1 of 2

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant (3)

Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT05 BATT05 LE12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.98 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (9 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY CS LIMITED New Build Generating CMU CONTEGO CONTEGO +3 more BN6
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (3 components)

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse. (3)

Active • 2025-26 (T-1), 2024-25 (T-1) ...
15.79 MW
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (1 component)

New build one-hour duration storage to replace diesel plant

Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT02 SA1
Inactive • 2023-24 (T-1)
3.35 MW
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX (1 component)

6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt

Storage (Duration 1h) STEVENAGE ELECTRIC FORECOURT LTD New Build Generating CMU Stevenage Electric Forecourt Rejected SG1
Inactive • 2023-24 (T-1)
1.12 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (5 components)

5MW, 1 hour/5MWh lithium-ion battery (3)

Storage Storage (Duration 1h) BRAINTREE ELECTRIC FORECOURT LTD New Build Generating CMU Braintree Electric Forecourt Braintree Electric Forecourt +2 more CM77
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.93 MW
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (3 components)
• 49.990 MW battery energy storage system at Richborough Energy Park
• Battery Energy Storage System
• Battery energy storage system at Richborough Energy Park
Storage (Duration 1h) RICHBOROUGH ENERGY PARK LIMITED Existing Generating CMU PGREP1 PGREP1 CT13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
20.03 MW
Richborough Energy Park Ramsgate road Sandwich CT13 9NL (3 components)
• 49.990 MW battery energy storage system
• Battery Energy Storage System
• battery energy storage system
Storage (Duration 1h) RICHBOROUGH ENERGY PARK LIMITED Existing Generating CMU PGREP2 PGREP2 CT13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
20.03 MW
Potash Farm, Nash Road, Beachampton, MK19 6EA (6 components)

49.900MW one-hour duration battery energy storage facility. (3)

Storage (Duration 1h) GSES 1 LIMITED New Build Generating CMU Stony A Stony A +4 more MK19
Active • 2025-26 (T-4), 2024-25 (T-1) ...
23.92 MW
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (5 components)

Battery storage plant (3)

Storage (Duration 1h) Storage (Duration 2h) COUPAR LIMITED New Build Generating CMU Coupar 20MW 2 hour BESS Coupar 21MW 2 hour BESS +3 more PH13
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.04 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.69 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Storage Storage (Duration 1h) Storage (Duration 0.5h) VATTENFALL WIND POWER LTD Existing Generating CMU Battery@PyC Battery@PyC +1 more Rejected CF42
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (4 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (3)

Storage (Duration 1h) NORWICH EAST ELECTRIC FORECOURT LTD New Build Generating CMU Norwich East Electric Forecourt Norwich East Electric Forecourt +2 more NR13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
2.57 MW
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (5 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
DSR Storage (Duration 1h) FAREHAM ENERGY RESERVE 2 LIMITED LIMEJUMP LTD Unproven DSR CMU New Build Generating CMU FAR226 PO14
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.42 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG. (6 components)

Battery Storage Plant (3)

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM WEST STORAGE LIMITED New Build Generating CMU Melksham West Storage1 Melksham West Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.98 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (6 components)

Battery Storage Plant (3)

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM EAST STORAGE LIMITED New Build Generating CMU Melksham East Storage1 Melksham East Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.76 MW
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (4 components)

Battery storage 40.000MW/40.000MWh one duration battery new build (3)

Storage (Duration 1h) CARE POWER (BARNSLEY) LIMITED New Build Generating CMU BARNB1 S70
Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.87 MW
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (16 components)

4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs (3)

Storage (Duration 1h) Zenobe Capenhurst Limited New Build Generating CMU Capenhurst Capenhurst +1 more CH1
Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.94 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (6 components)

Battery Storage Plant (3)

Storage (Duration 1h) Storage (Duration 2h) WEST DIDSBURY STORAGE LIMITED New Build Generating CMU West Didsbury Storage West Didsbury Storage +3 more M33
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.98 MW
Land off Dunsinane Avenue, Dunsinmore Industrial Estate, Dundee, Scotland, DD2 3QF (3 components)
• 49MW Lithium-ion Energy Storage System (2)
• 49.9MW Lithium-ion Energy Storage System
Storage (Duration 1h) SUSI EELPOWER DUNSINANE LIMITED New Build Generating CMU LYND21 LYND21 DD2
Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.28 MW
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (4 components)

New build battery storage 50.000MW/50.000MWh one hour duration asset (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.91 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (3 components)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU) (2)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
Storage (Duration 1h) Storage (Duration 2h) FP LUX SCURF DYKE SOLAR LIMITED New Build Generating CMU Scurf Dyke Solar Limited Scurf Dyke Solar Limited YO25
Active • 2025-26 (T-1), 2024-25 (T-1) ...
12.03 MW
Land East of Maldon Hall Farm, Maldon, Essex CM9 6HD (3 components)

40 MW/40MWh BESS (3)

Storage (Duration 1h) MALDON BESS LIMITED New Build Generating CMU MALDON MALDON +1 more CM9
Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.98 MW
Land at Weirs Drove, Cambridge, CB25 0BP (5 components)

49.900MW/49.900MWh battery storage asset, 1 hour duration (3)

Storage (Duration 1h) CARE POWER (BURWELL 1) LIMITED New Build Generating CMU BURWB1 Burwell Battery Storage Facility CB25
Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.84 MW
Loading map...
Showing 25 locations