Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

49 unique locations (158 components) - Page 1 of 2

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Albion Road, Dartford, Kent, UK, DA1 5PZ (6 components)
• A 2.5MW New Build Battery Storage System (2)
• A New Build 2.5MW Generation Battery Site
Storage (Duration 1h) HC ESS2 LIMITED New Build Generating CMU Littlebrook C Littlebrook C Not Prequalified DA1
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Altcar Training Camp Grange Road Ince Blundell, L38 7JE (2 components)

Battery Energy Storage System (2)

Storage (Duration 1h) KIWI POWER LTD New Build Generating CMU Rejected L38
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)

Battery Energy Storage System (3)

Storage (Duration 1h) LIMEJUMP LTD New Build Generating CMU KPB004 Not Prequalified TA4
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (4 components)
• 1.200MW Battery Energy Storage System (2)
• 1.2 MW of demand reduction
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 KnotKirkThry WF11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Church Bottom, Salisbury, SP4 6NN (3 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
Storage (Duration 1h) ARL 008 Limited New Build Generating CMU Conditional SP4
Inactive • 2022-23 (T-4)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
• 0.250MW Battery Energy Storage System (2)
• 0.25MW of Demand Reduction
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 YO25
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Crossways, Greenhithe, DA9 9BB (3 components)
• A Battery Energy Storage System. (2)
• 7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways
Storage (Duration 1h) ARL 002 Limited New Build Generating CMU Cotton Lane Not Prequalified DA9
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System
Storage (Duration 1h) ARL 001 Limited New Build Generating CMU Gipsy Lane A Not Prequalified OL11
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Greenfield Road, Westoning, Bedford, MK45 5JD (7 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Storage (Duration 1h) ARL O09 Limited New Build Generating CMU Greenfield Road A Greenfield Road B Not Prequalified MK45
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Storage Storage (Duration 1h) Storage (Duration 0.5h) Shaw-Energi Ltd New Build Generating CMU Hawthorne Road Hawthorne Road New Build Generating CMU +1 more Not Prequalified L20
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Hulley Road Macclesfield Cheshire SK10 2LP (1 component)

20.000 MW of battery storage located at Macclesfield

Storage (Duration 1h) Hulley Road Energy Storage Limited New Build Generating CMU Hulley Road SK10
Inactive • 2022-23 (T-4)
Land adjacent to electricity sub station Stonehill Charlton, Malmsbury, Wiltshire SN16 9DX (1 component)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage (Duration 1h) Lower Minety Energy Limited New Build Generating CMU Lower Minety Storage Conditional SN16
Inactive • 2022-23 (T-4)
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 1h) MINETY BATTERY STORAGE LIMITED New Build Generating CMU Minety Storage Minety Storage Conditional SN16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 1h) HILLHOUSE BATTERY STORAGE LIMITED New Build Generating CMU Hillhouse Storage Hillhouse Storage Conditional FY5
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 1h) WEST MELTON BATTERY STORAGE LIMITED New Build Generating CMU West Melton Storage West Melton Storage Conditional S63
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (9 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 1h) FISHCROSS BATTERY STORAGE LIMITED New Build Generating CMU Bankhead Storage Bankhead Storage +3 more Conditional FK10
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (2 components)
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
Storage Storage (Duration 1h) ENERGY STORE 6 LTD New Build Generating CMU York Energy Centre York Energy Centre Conditional YO61
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (1 component)

3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately

Storage (Duration 1h) BESS Claredown Limited New Build Generating CMU Conditional CO10
Inactive • 2022-23 (T-4)
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (5 components)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW. (2)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
Storage Storage (Duration 1h) RNA-Energy Ltd New Build Generating CMU Tollgate Battery Storage Facility Tollgate Battery Storage Facility +1 more Not Prequalified AL4
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at Traston Road, Newport NP19 4PW (1 component)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …

Storage (Duration 1h) FPC INDUSTRY & ENTERPRISE 2 LIMITED New Build Generating CMU Traston Road Conditional NP19
Inactive • 2022-23 (T-4)
Land in the vicinity of Feeder Road, to the east of Phillip Street, Bristol BS2 0TB, UK (1 component)

The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Storage (Duration 1h) Aura Power Storage Solutions Ltd New Build Generating CMU Feeder Road Battery Storage Facility Conditional BS2
Inactive • 2022-23 (T-4)
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (5 components)

New build storage facility (3)

Storage Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED New Build Generating CMU South Redhouse South Redhouse +1 more KY1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land off Carseview Road, Forfar, DD8 3BS (7 components)
• 3 gas reciprocating engines used for power generation, with associated infrastructure. (2)
• Battery storage and associated infrastructure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land off Tower House Lane, Saltend, Hull, UK, HU12 8EE (2 components)

The CMU component at the Saltend Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (2)

Storage Storage (Duration 1h) NORTH EAST GRID STORAGE ONE LTD New Build Generating CMU Saltend Battery Storage Facility Saltend Battery Storage Facility Conditional HU12
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (2 components)

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each. (2)

Storage Storage (Duration 1h) SOUTH WEST GRID STORAGE TWO LTD New Build Generating CMU Iron Acton Battery Storage Facility Iron Acton Battery Storage Facility Conditional BS37
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Loading map...
Showing 25 locations