Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

6 unique locations (88 components)

Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (11 components)
• Load reduction on site supported by non-exporting standby generation.
• N/A
• The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 MW.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (4 components)
• 49.990 MW battery energy storage system at Richborough Energy Park
• Battery Energy Storage System
• N/A
Active • 2025-26 (T-1), 2023-24 (T-1) ...
15.37 MW
Manchester Rd, Carrington, Manchester M31 4TG (33 components)
• 2 x 2.5 MW gas fuelled generators installed on land east of Griffiths Road.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
12.59 MW
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (6 components)
• N/A
• New build storage facility
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF (32 components)
• A gas engine CHP site providing electricity & heat to the associated development
• On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.59 MW
Church Bottom, Salisbury, SP4 6NN (2 components)
• 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• Onsite load reduction and back up generation behind the meter on multiple sites
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Loading map...
Showing 6 locations