Storage (Duration 1h)

4 unique locations (56 components)

BWW026, Pucklechurch, Shortwood Road, Pucklechurch, Bristol, BS16 9PQ (19 components)
• Battery Energy Storage System
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
7.31 MW
BWW032, Winscombe, Rowberrow, Winscombe, BS25 1QH (16 components)
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (9 components)
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
• Component has yet to be procured.
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
10.01 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (12 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• The CMU Component reduces import demand by turning on back up generation.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.39 MW
Loading map...
Showing 4 locations