Storage (Duration 1h)

7 unique locations (33 components)

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Bristol Avenue, Blackpool, FY2 0JF (7 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Battery Storage Storage (Duration 1h) Storage (Duration 2h) CONRAD (BLACKPOOL) LIMITED New Build Generating CMU Blackpool Blackpool +3 more FY2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
24.11 MW
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Storage Storage (Duration 1h) SIGBAT A LIMITED New Build Generating CMU UKER28 UKER28 +2 more CH65
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Milton Court Farm, Dorking, RH4 3LY (5 components)
• 6MW battery energy storage facility at Milton Court Farm, Dorking (2)
• 5MW battery energy storage facility at Milton Court Farm, Dorking
Storage Battery Storage Storage (Duration 1h) GBSL DORKING LIMITED New Build Generating CMU GBSL Dorking GBSL Dorking +1 more RH4
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Nunhide Lane Theale Berkshire RG31 7SD (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Storage Storage (Duration 1h) PEAK GEN POWER 26 LIMITED New Build Generating CMU Peak Gen Power 26 Peak Gen Power 26 +1 more Conditional RG31
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Sub station Percival Lane Runcorn Cheshire WA7 4DS (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (2)

Storage (Duration 1h) SIGBAT F LIMITED New Build Generating CMU UKER75 UKER77 WA7
Inactive • 2020-21 (T-4), 2019-20 (T-1)
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (5 components)

10MW battery energy storage facility at Upton Lane, Rownhams (3)

Storage Battery Storage Storage (Duration 1h) GBSL NURSLING LIMITED New Build Generating CMU GBSL Nursling GBSL Nursling +1 more Conditional SO16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...