Storage (Duration 1h)

10 unique locations (40 components)

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Storage Storage (Duration 1h) SIGBAT D LIMITED New Build Generating CMU UKER31 UKER33 +2 more Not Prequalified WN1
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (3 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU KnotKirkThry WF11
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Cleveland Potash ICL UK Boulby Mine Loftus Saltburn TS13 4UZ (2 components)

6MW BESS (2)

Storage Storage (Duration 1h) KIWI POWER LTD Existing Generating CMU Cleveland TS13
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Gateshead Local Environmental Services, Park Road, Gateshead, NE8 3HN (3 components)

Battery storage (3)

Storage Storage (Duration 1h) BRITISH GAS TRADING LIMITED New Build Generating CMU Gateshead Battery Storage NE8
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
J3 Business Park Balby Carr End Doncaster DN4 8DE (2 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Storage Storage (Duration 1h) Limejump Virtual 5 Limited New Build Generating CMU Doncaster Balby Doncaster Balby DN4
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 1h) MINETY BATTERY STORAGE LIMITED New Build Generating CMU Minety Storage Minety Storage Conditional SN16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Storage Storage (Duration 1h) SIGBAT A LIMITED New Build Generating CMU UKER28 UKER28 +2 more CH65
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 1h) HILLHOUSE BATTERY STORAGE LIMITED New Build Generating CMU Hillhouse Storage Hillhouse Storage Conditional FY5
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 1h) WEST MELTON BATTERY STORAGE LIMITED New Build Generating CMU West Melton Storage West Melton Storage Conditional S63
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (9 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 1h) FISHCROSS BATTERY STORAGE LIMITED New Build Generating CMU Bankhead Storage Bankhead Storage +3 more Conditional FK10
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 10 locations