Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1.5h)

110 unique locations (348 components) - Page 1 of 5

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
1 Barnett Wood Lane, Surrey, KT21 2BU (1 component)

98 MW BESS

Storage (Duration 1.5h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU Leatherhead Not Prequalified KT21
Active • 2028-29 (T-4)
15.46 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (7 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Storage (Duration 1h) Storage (Duration 1.5h) FEEDER GRID STORAGE LIMITED New Build Generating CMU Feeder Road Feeder Road +2 more BS2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
20.22 MW
Atcost Road, Barking Riverside, London, England, IG11 0EQ (1 component)

Battery energy storage system

Storage (Duration 1.5h) O&G SOLAR (SPV 52) LIMITED New Build Generating CMU Rejected IG11
Active • 2028-29 (T-4)
12.87 MW
Blackford, Aberdeenshire, AB51 8YN (2 components)

A 50MW New Build Battery Storage Site

Storage (Duration 1.5h) ROTHIENORMAN FLEXPOWER LTD New Build Generating CMU Rothienorman 50 Rothienorman 50 AB51
Active • 2028-29 (T-4), 2027-28 (T-4)
13.65 MW
Blandford Road, Poole, BH16 6AB (4 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR BLANDFORD ROAD LIMITED New Build Generating CMU Poise 1 Poise 1 +1 more BH16
Active • 2026-27 (T-4), 2025-26 (T-1) ...
23.04 MW
Bore Tree Baulk, Grimston, Dunnington, York, YO19 5HE (3 components)

New build battery storage

Active • 2025-26 (T-4), 2024-25 (T-1) ...
27.41 MW
Bore Tree Baulk, Grimston, Dunnington, York,YO19 5HE (3 components)

New build battery storage (3)

Storage (Duration 1.5h) UK BATTERY STORAGE LTD New Build Generating CMU York York +1 more YO19
Active • 2025-26 (T-4), 2024-25 (T-1) ...
20.23 MW
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Brodsworth Storage Brodsworth Storage DN6
Active • 2027-28 (T-4), 2026-27 (T-4)
3.51 MW
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
10.04 MW
Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire, HP27 9RE (1 component)

New 49.5MW Battery Energy Storage system

Storage (Duration 1.5h) HARMONY BF2 LIMITED New Build Generating CMU HBF221 Not Prequalified HP27
Active • 2025-26 (T-4)
14.82 MW
Calow Green, Calow, S44 5XQ (3 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 005 LIMITED New Build Generating CMU Calow Green Calow Green +1 more Not Prequalified S44
Active • 2026-27 (T-4)
53.16 MW
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System

Active • 2026-27 (T-4), 2025-26 (T-4) ...
33.77 MW
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (4 components)
• An 87.500 MW Battery Storage Site Component.
• An 87.500 MW New Build Battery Storage Site Component
• An 87.500 MW New Build Battery Storage Site Component.
Active • 2028-29 (T-4)
55.20 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (6 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CF LIMITED New Build Generating CMU CHAPELFARM CHAPELFARM +3 more LU4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
91.90 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
113.67 MW
Clay Tye Road, Upminister, RM14 3PL (6 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF 2 LIMITED New Build Generating CMU CLAY TYE FARM 2 CLAYTYE2 +2 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
81.52 MW
Craigie, South Ayrshire, Scotland, KA1 5JT (2 components)

A 175MW New Build Battery Storage Site Component

Storage (Duration 1.5h) KILMARNOCK FLEXPOWER LTD New Build Generating CMU Kilmarnock 1 Kilmarnock 1 Not Prequalified KA1
Active • 2027-28 (T-4)
40.32 MW
Darrington Landfill Site, Darrington Leys, Cridling Stubbs, Knottingley, West Yorkshire, WF11 0AH (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Darrington Storage Darrington Storage Not Prequalified WF11
Active • 2025-26 (T-4)
7.49 MW
Draycott Cross Road, Cheadle, ST10 1PN (1 component)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Storage (Duration 1.5h) BALANCE ENERGY 8 LTD New Build Generating CMU Hinckley ST10
Active • 2027-28 (T-4)
4.61 MW
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (2 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (2)

Active • 2025-26 (T-1), 2024-25 (T-1)
3.74 MW
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire, FK15 9RA (3 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

Active • 2027-28 (T-4), 2025-26 (T-1) ...
4.51 MW
French's Road, Model Farm, Walpole, Walpole Marsh, King's Lynn and West, PE14 7JF. (4 components)
• 25MW Lithium-ion Energy Storage System
• 99.9MW Lithium-ion Energy Storage System
Storage (Duration 1.5h) Lapwing Fen II LTD New Build Generating CMU LAPA LAPA +2 more Rejected PE14
Active • 2027-28 (T-4)
28.78 MW
Kearsley Road, Cinder Hill, Ringley, Bolton, Greater Manchester, M26 1AH (1 component)

Battery storage station

Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Shoreside Storage M26
Active • 2027-28 (T-4)
0.81 MW
Kilwinning, North Ayrshire, Scotland, KA13 7RU, United Kingdom (1 component)

Battery energy storage system

Active • 2028-29 (T-4)
4.71 MW
Loading map...
Showing 25 locations