Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1.5h)

12 unique locations (18 components)

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
Minchens Lane, Bramley, RG7 2NL (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system

Active • 2028-29 (T-4), 2027-28 (T-4)
15.56 MW
Land West of Honiley Road (A4177), Honiley, Kenilworth, CV35 7LY (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED ENSO GREEN HOLDINGS P LIMITED New Build Generating CMU BERKSWELL HR BERKSWELL HR CV35
Active • 2028-29 (T-4), 2027-28 (T-4)
15.56 MW
Land to the west of Pound Road, Axminster EX13 5UP (2 components)
• A 120.000 MW / 180.000 MWh battery energy storage system
• A 120.000 MW / 240.000 MWh battery energy storage system
Active • 2027-28 (T-4), 2026-27 (T-4)
42.18 MW
Land to the west of Pound Road, Axminster EX135UP (2 components)
• A 120.000 MW / 180.000 MWh battery energy storage system
• A 120.000 MW / 240.000 MWh battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU AXMINSTER Axminster - Pound Rd Not Prequalified EX13
Active • 2027-28 (T-4), 2026-27 (T-4)
42.18 MW
Land to the south of Church Farm, Somersham, IP8 4PN and land to the east of The Channel, Burstall, IP8 4JL (1 component)

A 57.000 MW / 85.500 MWh battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU BRAMFORD 2 IP8
Active • 2027-28 (T-4)
6.57 MW
Land to the East of Bumble Bee Farm, Gainsborough Road (A620), Saundby, DN22 9ER (2 components)
• A 110.000 MW / 165.000 MWh battery energy storage system
• A 120.000 MW / 180.000 MWh battery energy storage system
Active • 2028-29 (T-4), 2027-28 (T-4)
31.60 MW
Land south of Southlands Cottages Runwell Road Runwell Wickford Essex SS11 7QH (1 component)

A 47.500 MW / 71.250 MWh battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU RAYLEIGH 2 SL Not Prequalified SS11
Active • 2027-28 (T-4)
5.47 MW
27.29 MW
Land north of Coxmoor Wood, off Crondall Road, Crookham Village, Fleet, GU51 5SU (1 component)

A 46.000 MW / 69.00 MWh battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU FLEET Not Prequalified GU51
Active • 2027-28 (T-4)
5.30 MW
Land north of Butterfly Lane, land surrounding Hilfield Farm and land west of Hilfield Lane, Aldenham, near WD25 8DD (1 component)

A 57.000 MW / 85.500 MWh battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU ELSTREE H Rejected WD25
Active • 2027-28 (T-4)
6.57 MW
Land At Warren Farm High Street Dunsville Doncaster DN7 4BT (1 component)

A battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU FLEET BESS DN7
Active • 2028-29 (T-4)
7.49 MW
Loading map...
Showing 12 locations