Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1.5h)

17 unique locations (73 components)

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
136.34 MW
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (5 components)
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2029-30 (T-4), 2027-28 (T-4) ...
8.20 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (9 components)

New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation

Active • 2029-30 (T-4), 2028-29 (T-4) ...
119.78 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (9 components)
• Battery Project on Greenfield Site
• Battery Project on greenfield site
• Battery Storage site at greenfield project.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
119.78 MW
Land south of Southlands Cottages, Runwell Road, Runwell, Wickford, Essex, SS11 7QH (2 components)
• A 47.500 MW / 71.250 MWh battery energy storage system
• A 57.000 MW / 85.500 MWh battery energy storage system
Active • 2029-30 (T-4), 2027-28 (T-4)
14.83 MW
Land south of Southlands Cottages Runwell Road Runwell Wickford Essex SS11 7QH (2 components)
Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU RAYLEIGH 2 SL Not Prequalified SS11
Active • 2029-30 (T-4), 2027-28 (T-4)
14.83 MW
Land South Of Marsh Farm Marsh Lane Fobbing Essex SS17 9JW (2 components)
• A 49.400 MW / 98.800 MWh battery energy storage system
• A 57.000 MW / 85.500 MWh battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU RAYLEIGH 1 Not Prequalified SS17
Active • 2029-30 (T-4), 2026-27 (T-4)
21.03 MW
LAND SOUTH OF GUNTHORPE ROAD, WALPOLE MARSH, WISBECH, NEAR PE14 7JH (3 components)

A 100.000 MW / 150.000 MWh battery energy storage system

Active • 2029-30 (T-4), 2028-29 (T-4) ...
43.70 MW
Land north of Coxmoor Wood, off Crondall Road, Crookham Village, Fleet, GU51 5SU (2 components)
• A 46.000 MW / 69.00 MWh battery energy storage system
• A 47.500 MW / 71.250 MWh battery energy storage system
Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU FLEET Not Prequalified GU51
Active • 2029-30 (T-4), 2027-28 (T-4)
13.09 MW
Land at Impens Farm, Petherton Road, North Newton, Bridgwater, Somerset, TA7 0BB (3 components)
• A 49.400 MW / 98.800 MWh battery energy storage system
• A 57.000 MW / 85.500 MWh battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU BRIDGWATER 2 WEST BURTON TA7
Active • 2029-30 (T-4), 2026-27 (T-4)
32.70 MW
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (8 components)
• A battery energy storage system
• A new build 10MW battery storage system
• A new build 11MW battery storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT BD LIMITED New Build Generating CMU BROADDITCH BROADDITCH +3 more DA13
Active • 2029-30 (T-4), 2025-26 (T-4) ...
9.44 MW
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire, FK15 9RA (5 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

Active • 2029-30 (T-4), 2027-28 (T-4) ...
8.20 MW
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (7 components)
• A 47.380 MW component of a 350 MW new-build Battery Storage Site.
• A 47.380 component of a 350 MW new-build Battery Storage Site.
• An 87.500 MW Battery Storage Site Component.
Active • 2029-30 (T-4), 2028-29 (T-4)
133.50 MW
1 Barnett Wood Lane, Surrey, KT21 2BU (2 components)
• 24.5 MW BESS
• 98 MW BESS
Storage (Duration 6h) Storage (Duration 1.5h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU Leatherhead Not Prequalified KT21
Active • 2029-30 (T-4), 2028-29 (T-4)
31.65 MW
Loading map...
Showing 17 locations