Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1.5h)

22 unique locations (69 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)

Battery Storage Station (3)

Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Union Road Storage Union Road Storage +2 more BL2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.88 MW
136.34 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Gas turbine generator
Active • 2028-29 (T-4), 2027-28 (T-4) ...
114.55 MW
Minchens Lane, Bramley, RG7 2NL (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system

Active • 2028-29 (T-4), 2027-28 (T-4)
15.56 MW
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
9.71 MW
Land West of Honiley Road (A4177), Honiley, Kenilworth, CV35 7LY (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED ENSO GREEN HOLDINGS P LIMITED New Build Generating CMU BERKSWELL HR BERKSWELL HR CV35
Active • 2028-29 (T-4), 2027-28 (T-4)
15.56 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (9 components)
• Battery Project on Greenfield Site
• Battery Project on greenfield site
• Battery Storage site at greenfield project.
• ... and 2 more unique descriptions
Active • 2029-30 (T-4), 2028-29 (T-4) ...
119.78 MW
Land to the south of Ashton Hall Farm, Tontine Road, Up Holland, Lancashire, WN8 0NF (1 component)

Battery energy storage project

Active • 2028-29 (T-4)
11.04 MW
LAND TO THE REAR OF HUMBERSTON SUBSTATION, HUMBERSTON, DN36 4RJ (3 components)
• New Build 49.9MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY HB (JV) LIMITED New Build Generating CMU Humberston ESS Humberston ESS +1 more Not Prequalified DN36
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.77 MW
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (3 components)
• New Build 49.5 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY FW LIMITED New Build Generating CMU Flatworth ESS Flatworth ESS +1 more NE29
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.70 MW
Land to the East of Bumble Bee Farm, Gainsborough Road (A620), Saundby, DN22 9ER (2 components)
• A 110.000 MW / 165.000 MWh battery energy storage system
• A 120.000 MW / 180.000 MWh battery energy storage system
Active • 2028-29 (T-4), 2027-28 (T-4)
31.60 MW
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
• A new build 99.9MW battery energy storage system
• A new build battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY WB (JV) LIMITED New Build Generating CMU Wakefield ESS Wakefield ESS +1 more Rejected WF1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.77 MW
LAND SOUTH OF GUNTHORPE ROAD, WALPOLE MARSH, WISBECH, NEAR PE14 7JH (3 components)

A 100.000 MW / 150.000 MWh battery energy storage system

Active • 2029-30 (T-4), 2028-29 (T-4) ...
43.70 MW
Land east of Nailcote Farm, Burton Green, Berkswell, Coventry, CV7 7DE (1 component)

49.9MW lithium ion battery energy storage located at Berkswell near Coventry

Active • 2028-29 (T-4)
7.87 MW
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (3 components)
• New Build 49.99 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CAS LIMITED New Build Generating CMU Castleford ESS Castleford ESS +1 more Rejected WF11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.79 MW
Land At Warren Farm High Street Dunsville Doncaster DN7 4BT (1 component)

A battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU FLEET BESS DN7
Active • 2028-29 (T-4)
7.49 MW
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Active • 2028-29 (T-4), 2027-28 (T-4)
16.07 MW
Kilwinning, North Ayrshire, Scotland, KA13 7RU, United Kingdom (1 component)

Battery energy storage system

Active • 2028-29 (T-4)
4.71 MW
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (7 components)
• A 47.380 MW component of a 350 MW new-build Battery Storage Site.
• A 47.380 component of a 350 MW new-build Battery Storage Site.
• An 87.500 MW Battery Storage Site Component.
Active • 2029-30 (T-4), 2028-29 (T-4)
133.50 MW
Blackford, Aberdeenshire, AB51 8YN (2 components)

A 50MW New Build Battery Storage Site

Storage (Duration 1.5h) ROTHIENORMAN FLEXPOWER LTD New Build Generating CMU Rothienorman 50 Rothienorman 50 AB51
Active • 2028-29 (T-4), 2027-28 (T-4)
13.65 MW
Atcost Road, Barking Riverside, London, England, IG11 0EQ (1 component)

Battery energy storage system

Storage (Duration 1.5h) O&G SOLAR (SPV 52) LIMITED New Build Generating CMU Rejected IG11
Active • 2028-29 (T-4)
12.87 MW
1 Barnett Wood Lane, Surrey, KT21 2BU (2 components)
• 24.5 MW BESS
• 98 MW BESS
Active • 2029-30, 2028-29
31.65 MW
Loading map...
Showing 22 locations