Storage (Duration 1.5h)

51 unique locations (202 components) - Page 1 of 3

Active MW: 0.00 MW
Inactive MW: 0.00 MW
19.43 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
The Manorway, Stanford-le-Hope, SS17 9LL (9 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.94 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (9 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
2.01 MW
RYE COMMON LANE BATTERY, BLUE BELL LODGE, RYE COMMON LANE, CRONDALL, FARNHAM, SURREY, GU10 5DE (1 component)

New Build 99 MW Battery Energy Storage system

Storage (Duration 1.5h) HARMONY RC LIMITED New Build Generating CMU Rye Common 1 ESS GU10
Active • 2026-27 (T-4)
17.59 MW
Rush Green Farm, London Road, Hitchin, SG4 7PQ (2 components)
• The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export capacity of 50MVA.
• The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export capacity of at least 42MVA.
Storage (Duration 1.5h) RG STEVENAGE BESS LTD New Build Generating CMU RGS001 SG4
Active • 2026-27 (T-4), 2025-26 (T-4)
7.46 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 003 LIMITED New Build Generating CMU Royle Barn Road Royle Barn Road +3 more OL11
Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.13 MW
136.34 MW
Richborough Energy Park, Ramsgate Road, Sandwich, CT13 9NL (10 components)
• 35.000MW battery energy storage system
• 35.000MW battery energy storage system.
• 49.990 MW battery energy storage system
Active • 2027-28 (T-4), 2026-27 (T-4) ...
65.86 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
42.89 MW
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (5 components)
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2029-30 (T-4), 2027-28 (T-4) ...
8.20 MW
Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham, SN12 8LW (3 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 004 LIMITED New Build Generating CMU Norrington Gate Farm Norrington Gate Farm +1 more Rejected SN12
Active • 2026-27 (T-4)
79.82 MW
Netherlands Way, Stallingborough, DN41 8DF (2 components)

New build battery storage facility

Storage (Duration 1.5h) ECOSTOR 1 IMMINGHAM LTD New Build Generating CMU ECOSTA DN41
Active • 2026-27 (T-4)
14.22 MW
Maes Mawr Farm, Pound Farm Lane, Llantwit Fardre, Tonteg, CF38 1SU (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.27 MW
LAND WITHIN HUNSHELF COMPOUND, TOFT'S LANE, OXSPRING, BARNSLEY, S36 8WR (2 components)
• New Build 25 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY HS (JV) LIMITED New Build Generating CMU Hunshelf ESS Hunshelf ESS S36
Active • 2027-28 (T-4), 2026-27 (T-4)
7.52 MW
Land to the west of Pound Road, Axminster EX13 5UP (2 components)
• A 120.000 MW / 180.000 MWh battery energy storage system
• A 120.000 MW / 240.000 MWh battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED AXMINSTER Axminster - Pound Rd Not Prequalified EX13
Active • 2027-28 (T-4), 2026-27 (T-4)
42.18 MW
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (4 components)
• A 49.9 Energy Storage System
• A Lithium Ion Battery Energy Storage System
• A Lithium Ion Energy Storage System
Storage (Duration 2h) Storage (Duration 1.5h) HEIT HP LIMITED New Build Generating CMU Hawthorn Pit Hawthorn Pit BESS +2 more SR7
Active • 2026-27 (T-4), 2025-26 (T-1) ...
46.36 MW
LAND TO THE REAR OF HUMBERSTON SUBSTATION, HUMBERSTON, DN36 4RJ (3 components)
• New Build 49.9MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY HB (JV) LIMITED New Build Generating CMU Humberston ESS Humberston ESS +1 more Not Prequalified DN36
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.77 MW
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (3 components)
• New Build 49.5 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY FW LIMITED New Build Generating CMU Flatworth ESS Flatworth ESS +1 more NE29
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.70 MW
Land to the east of the Channel, Burstall, Suffolk, IP8 4JL (1 component)

Lithium-based battery energy storage system.

Storage (Duration 1.5h) BRAMFORD GREEN LIMITED New Build Generating CMU ThorpeMarsh IP8
Active • 2026-27 (T-4)
8.89 MW
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ (2 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours

Storage (Duration 1.5h) FPC ELECTRIC LAND LIMITED New Build Generating CMU BURTON0076 Hawkins Not Prequalified DE14
Active • 2027-28 (T-4), 2026-27 (T-4)
7.32 MW
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)

This is a 49.99MW battery storage facility connected at 33kV.

Storage (Duration 2h) Storage (Duration 1.5h) ROARING HILL ENERGY STORAGE LTD New Build Generating CMU Roaring Hill Roaring Hill +1 more KY6
Active • 2026-27 (T-4), 2025-26 (T-1) ...
33.35 MW
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (3 components)
• 47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site.
• Battery energy storage site with 47.5MW capacity located at Indian Queens substation.
Storage (Duration 2h) Storage (Duration 1.5h) SAMBAR POWER LIMITED New Build Generating CMU Indian Queens BESS Indian Queens BESS 1 PL26
Active • 2027-28 (T-4), 2026-27 (T-1) ...
31.30 MW
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)

Lithium-based battery energy storage system.

Storage (Duration 2h) Storage (Duration 1.5h) WALPOLE GREEN LIMITED New Build Generating CMU Walpole Walpole +1 more PE14
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.70 MW
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
• A new build 99.9MW battery energy storage system
• A new build battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY WB (JV) LIMITED New Build Generating CMU Wakefield ESS Wakefield ESS +1 more Rejected WF1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.77 MW
Loading map...