33 unique locations (171 components) - Page 1 of 2

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (7 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Storage (Duration 1h) Storage (Duration 1.5h) FEEDER GRID STORAGE LIMITED New Build Generating CMU Feeder Road Feeder Road +2 more BS2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.35 MW
Bore Tree Baulk, Grimston, Dunnington, York, YO19 5HE (4 components)
• New build battery storage
• The CMU Component is an Existing Generating battery storage site.
Active • 2026-27 (T-1), 2025-26 (T-4) ...
24.74 MW
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.73 MW
Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire, HP27 9RE (1 component)

New 49.5MW Battery Energy Storage system

Storage (Duration 1.5h) HARMONY BF2 LIMITED New Build Generating CMU HBF221 Not Prequalified HP27
Active • 2025-26 (T-4)
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System

Active • 2026-27 (T-4), 2025-26 (T-4) ...
23.81 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (6 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CF LIMITED New Build Generating CMU CHAPELFARM CHAPELFARM +3 more LU4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
29.21 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (6 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF 2 LIMITED New Build Generating CMU CLAY TYE FARM 2 CLAYTYE2 +2 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Darrington Landfill Site, Darrington Leys, Cridling Stubbs, Knottingley, West Yorkshire, WF11 0AH (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Darrington Storage Darrington Storage Not Prequalified WF11
Active • 2025-26 (T-4)
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (4 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• 49.9MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) 2 LIMITED New Build Generating CMU PILLSWOOD2 PILLSWOOD2 +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (8 components)
• A battery energy storage system
• A new build 10MW battery storage system
• A new build 11MW battery storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT BD LIMITED New Build Generating CMU BROADDITCH BROADDITCH +3 more DA13
Active • 2029-30 (T-4), 2025-26 (T-4) ...
9.44 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT BF LIMITED New Build Generating CMU BUMPERS BUMPERS +7 more HP27
Active • 2026-27 (T-4), 2025-26 (T-4) ...
65.35 MW
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP (4 components)

This is a 20MW battery storage facility connected at 33kV.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.71 MW
Land at Jamesfield Farm, Abernethy, Fife, KY14 6EW (2 components)

A new build 19MW battery energy storage system

Active • 2025-26 (T-4), 2024-25 (T-1)
4.31 MW
Land at West Road, Trafford Park, M41 7SW (7 components)
• 3 x 2MW gas gen sets
• 8 x 2MW gas gen sets at West Road
• Battery Storage Station
Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Taylor Road Storage Taylor Road Storage +2 more M41
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.12 MW
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HARMONY JF LIMITED New Build Generating CMU JAMESFIELD JAMESFIELD +3 more KY14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.80 MW
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
• A 48MW battery energy storage system
• A 49.5MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) LIMITED New Build Generating CMU PILLSWOOD PILLSWOOD +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land South of National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester, CH66 2HD (4 components)

Standalone Battery Storage Asset

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) NATIVE RIVER LTD New Build Generating CMU Native River Native River +1 more CH66
Active • 2026-27 (T-4), 2025-26 (T-4) ...
38.53 MW
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
• A new build 19MW battery energy storage system
• A new build 20MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT FM LIMITED New Build Generating CMU FARNHAM FARNHAM +2 more GU10
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR WELKIN MILL LIMITED New Build Generating CMU Welkin Mill 1 Welkin Mill 1 +5 more SK6
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.93 MW
Levitt Hagg Landfill Site, Warmsworth, Doncaster, South Yorkshire, DN4 9RS (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Levitt Hagg Storage Levitt Hagg Storage Not Prequalified DN4
Active • 2025-26 (T-4)
Little Raith Farm, Auchtertool, Fife, KY5 0AX (7 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HEIT LR LIMITED New Build Generating CMU LR22 LR22 +3 more KY5
Active • 2025-26 (T-4), 2024-25 (T-4) ...
29.43 MW
Maes Mawr Farm, Pound Farm Lane, Llantwit Fardre, Tonteg, CF38 1SU (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.27 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components)
• A 40MW New Build Battery Storage site
• A 45MWh New Build Battery Storage site
Storage (Duration 1h) Storage (Duration 1.5h) STAIRFOOT GENERATION LTD New Build Generating CMU Stairfoot 1 Stairfoot 1 +3 more S71
Active • 2025-26 (T-4), 2024-25 (T-4) ...
10.78 MW
Potman's Lane, Battle, TN33 9BL (11 components)
Storage (Duration 1h) Storage (Duration 1.5h) BRK 002 LIMITED BRK 002 Limited New Build Generating CMU Potmans Lane Potmans Lane +3 more TN33
Active • 2025-26 (T-4), 2024-25 (T-4) ...
14.67 MW
Loading map...