Storage (Duration 1.5h)

8 unique locations (35 components)

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (6 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF 2 LIMITED New Build Generating CMU CLAY TYE FARM 2 CLAYTYE2 +2 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
39.88 MW
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (3 components)

New Build Battery Storage Facility

Active • 2026-27 (T-4), 2025-26 (T-1) ...
39.88 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (4 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• 49.9MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) 2 LIMITED New Build Generating CMU PILLSWOOD2 PILLSWOOD2 +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP (4 components)

This is a 20MW battery storage facility connected at 33kV. (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.71 MW
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (4 components)

This is a 20MW battery storage facility connected at 33kV.

Storage (Duration 2h) Storage (Duration 1.5h) HAWKERS HILL ENERGY PARK LIMITED New Build Generating CMU Hawkers Hill Hawkers Hill +2 more SP7
Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.71 MW
Rusholme Grange, Drax, YO8 8PW (3 components)
• Lithium-ion Battery Energy Storage System
• New build 35MW Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY RH LTD New Build Generating CMU HRHL21 Rusholme BESS +1 more YO8
Active • 2025-26 (T-4), 2024-25 (T-1) ...
20.89 MW
Loading map...
Showing 8 locations