Storage (Duration 1.5h)

23 unique locations (129 components)

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (9 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
6.72 MW
Rusholme Grange, Drax, YO8 8PW (3 components)
• Lithium-ion Battery Energy Storage System
• New build 35MW Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY RH LTD New Build Generating CMU HRHL21 Rusholme BESS +1 more YO8
Active • 2025-26 (T-4), 2024-25 (T-1) ...
31.37 MW
Richborough Energy Park, Ramsgate Road, Sandwich, CT13 9NL (6 components)
• 35.000MW battery energy storage system
• 35.000MW battery energy storage system.
• Battery Energy Storage
Active • 2027-28 (T-4), 2026-27 (T-4) ...
33.08 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
174.30 MW
Potman's Lane, Battle, TN33 9BL (5 components)
• A Battery Energy Storage System
• A Battery Energy Storage System, which has already PQ'd as POTM25
Storage (Duration 1h) Storage (Duration 1.5h) BRK 002 LIMITED BRK 002 Limited New Build Generating CMU Potmans Lane Potmans Lane +3 more TN33
Active • 2025-26 (T-4), 2024-25 (T-4) ...
51.48 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components)
• A 40MW New Build Battery Storage site
• A 45MWh New Build Battery Storage site
Storage (Duration 1h) Storage (Duration 1.5h) STAIRFOOT GENERATION LTD New Build Generating CMU Stairfoot 1 Stairfoot 1 +3 more S71
Active • 2025-26 (T-4), 2024-25 (T-4) ...
39.72 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (7 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HEIT LR LIMITED New Build Generating CMU LR22 LR22 +3 more KY5
Active • 2025-26 (T-4), 2024-25 (T-4) ...
101.29 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR WELKIN MILL LIMITED New Build Generating CMU Welkin Mill 1 Welkin Mill 1 +5 more SK6
Active • 2025-26 (T-4), 2024-25 (T-4) ...
46.27 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (6 components)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
Storage (Duration 2h) Storage (Duration 1.5h) GRIDSOURCE (WOBURN RD) LIMITED New Build Generating CMU Woburn Road Woburn Road +2 more MK43
Active • 2027-28 (T-4), 2026-27 (T-4) ...
15.66 MW
Land at West Road, Trafford Park, M41 7SW (7 components)
• 3 x 2MW gas gen sets
• 8 x 2MW gas gen sets at West Road
• Battery Storage Station
Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Taylor Road Storage Taylor Road Storage +2 more M41
Active • 2026-27 (T-4), 2025-26 (T-4) ...
36.82 MW
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (4 components)

This is a 20MW battery storage facility connected at 33kV. (3)

Storage (Duration 2h) Storage (Duration 1.5h) HAWKERS HILL ENERGY PARK LIMITED New Build Generating CMU Hawkers Hill Hawkers Hill +2 more SP7
Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.71 MW
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP (4 components)

This is a 20MW battery storage facility connected at 33kV.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
27.83 MW
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (6 components)
• A new build 10MW battery storage system
• A new build 11MW battery storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT BD LIMITED New Build Generating CMU BROADDITCH BROADDITCH +3 more DA13
Active • 2025-26 (T-4), 2024-25 (T-4) ...
19.42 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (4 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• 49.9MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) 2 LIMITED New Build Generating CMU PILLSWOOD2 PILLSWOOD2 +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
84.42 MW
Clay Tye Road, Upminister, RM14 3PL (6 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF 2 LIMITED New Build Generating CMU CLAY TYE FARM 2 CLAYTYE2 +2 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
81.52 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
113.67 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (6 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CF LIMITED New Build Generating CMU CHAPELFARM CHAPELFARM +3 more LU4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
91.90 MW
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System

Active • 2026-27 (T-4), 2025-26 (T-4) ...
33.77 MW
Bore Tree Baulk, Grimston, Dunnington, York,YO19 5HE (3 components)

New build battery storage (3)

Storage (Duration 1.5h) UK BATTERY STORAGE LTD New Build Generating CMU York York +1 more YO19
Active • 2025-26 (T-4), 2024-25 (T-1) ...
20.23 MW
Bore Tree Baulk, Grimston, Dunnington, York, YO19 5HE (3 components)

New build battery storage

Active • 2025-26 (T-4), 2024-25 (T-1) ...
27.41 MW
Blandford Road, Poole, BH16 6AB (4 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR BLANDFORD ROAD LIMITED New Build Generating CMU Poise 1 Poise 1 +1 more BH16
Active • 2026-27 (T-4), 2025-26 (T-1) ...
23.04 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (7 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Storage (Duration 1h) Storage (Duration 1.5h) FEEDER GRID STORAGE LIMITED New Build Generating CMU Feeder Road Feeder Road +2 more BS2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
20.22 MW