Storage (Duration 1.5h)

7 unique locations (42 components)

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.07 MW
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
• A new build 19MW battery energy storage system
• A new build 20MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT FM LIMITED New Build Generating CMU FARNHAM FARNHAM +2 more GU10
Active • 2025-26 (T-4), 2024-25 (T-4) ...
28.73 MW
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
• A 48MW battery energy storage system
• A 49.5MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) LIMITED New Build Generating CMU PILLSWOOD PILLSWOOD +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
80.74 MW
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HARMONY JF LIMITED New Build Generating CMU JAMESFIELD JAMESFIELD +3 more KY14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
55.69 MW
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (6 components)
• A new build 10MW battery storage system
• A new build 11MW battery storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT BD LIMITED New Build Generating CMU BROADDITCH BROADDITCH +3 more DA13
Active • 2025-26 (T-4), 2024-25 (T-4) ...
19.42 MW
Clay Tye Road, Upminister, RM14 3PL (6 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF 2 LIMITED New Build Generating CMU CLAY TYE FARM 2 CLAYTYE2 +2 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
81.52 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
113.67 MW
Loading map...
Showing 7 locations